My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2010
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3940
>
2300 - Underground Storage Tank Program
>
PR0507837
>
COMPLIANCE INFO_2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2024 4:46:23 PM
Creation date
6/3/2020 9:59:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010
RECORD_ID
PR0507837
PE
2361
FACILITY_ID
FA0008057
FACILITY_NAME
TRACY TRUCK AND AUTO STOP
STREET_NUMBER
3940
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95304
APN
21220004
CURRENT_STATUS
01
SITE_LOCATION
3940 N TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0507837_3940 N TRACY_2010.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
348
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STEP I Identify the damaged boot and select the proper Blueline Repair <br /> Boot based upon the number of studs and the pipe OD.(See 2006 <br /> Catalog,Section 10 and Appendix 1) <br /> - A ML**A,- <br /> STEP 2 Install all Pellethane split components onto the pipe carefully.All <br /> Pellethane pieces must be rebonded back together with Blue Sea] <br /> Glue.This is done by ensuring that the surfaces are clean and dry. <br /> Apply a liberal bead of Blue Seal and hold the seam closed <br /> securely until it is fused. It's helpful to use the clamps to loosely <br /> hold the boot closed during curing. Bonded connections should <br /> hold themselves closed within rive minutes if there are no stresses <br /> on them.The Blue Seal glue will be fully cured in 40 minutes. <br /> STEP 3 Once all Blueline approved components are bonded, apply a <br /> liberal bead of either Parasealaut 626, or Bostik 1100FS to the <br /> underside of the seal.This will make the seal with the sump wall. 1 4 <br /> Insert poly ring Into the gasket and position the ring around the <br /> old fitting and against the sump wall. <br /> STEP 4 Install the self tapping tek screws through the holes in the poly <br /> ring and tighten until snug.(Be careful not to over tighten as the <br /> holes can be easily stripped out.) 16 <br /> STEP 5 Apply a bead of Blue Seal Glue along the gasket rim and install <br /> the boot onto the seal. Install boot with fill tube at the 12:00 <br /> position.Install band clamp to secure the boot to the gasket <br />
The URL can be used to link to this page
Your browser does not support the video tag.