Laserfiche WebLink
San Joaquin County <br /> Environmental Health Department DIRECTOR <br /> =a�� •� Donna Heran,REHS <br /> 600 East Main Street <br /> PROGRAM COORDINATORS <br /> Stockton, California 95202-3029 Margaret Lagorio,REHS <br /> • ' Robert McClellon,REHS <br /> C <br /> Website: www.sjgov.org/ehd <br /> Jeff Carruesco,REHS,RDI 9�%FORa�QKaseyFoley,REHS <br /> Phone: (209)468-3420 <br /> September 15, 2010 Fax: (209)464-0138 <br /> Melissa Brueckner <br /> A.P.E.C. <br /> P.O. Box 55105 <br /> Stockton, CA 95205 <br /> Re: Tracy Truck &Auto Stop SR0060197, revised <br /> 3940 N. Tracy Blvd., Tracy <br /> The San Joaquin County Environmental Health Department (EHD) has completed the review of <br /> the revised application for a permit to install intrinsically safe wiring to the L16 diesel east <br /> annular sensor and repair the diesel east piping sump on the underground storage tank (UST) <br /> system at the above noted address. Additional repairs were proposed due to a leak in the <br /> secondary containment on the diesel piping, requiring breaking concrete next to dispenser 17. <br /> The permit has been approved with the following conditions: <br /> 1. Contact the local fire department and the San Joaquin Valley Air Pollution Control <br /> District for any applicable permits and requirements. <br /> 2. Any changes in information and scope of work must be submitted to EHD for approval <br /> prior to commencing work. All new addenda supersede the previous ones. <br /> 3. Contact Stacy Rivera at(209)468-3440 to arrange the following inspection <br /> appointments (a 48-hour notice is required for inspection appointments). Please be <br /> aware that inspections for emergency work must be scheduled within five days of permit <br /> approval. <br /> a. Sensor functionality: Functionality of the monitoring system must be verified to <br /> ensure that monitoring has been restored to meet the requirements of Title 23 <br /> California Code of Regulations and the Health & Safety Code. A copy of the alarm <br /> history shall be printed prior to performing the"cold start" of the Veeder Root system <br /> and made available at the time of EHD inspection. This was completed on July 26, <br /> 2010. <br /> b. 24-hour hydrostatic test(or equivalent)on diesel east sump. This was completed on <br /> September 10, 2010. <br /> c. 24-hour hydrostatic test(or equivalent)on UDC#17. <br /> d. Secondary containment testing on diesel piping. <br /> Please be aware that the facility cannot operate the UST system prior to the EHD <br /> inspection and approval. <br />