Laserfiche WebLink
Sep.14.2010 09:51 AM PAGE. 2/ 3 <br /> w#HL <br /> GROUP INC, <br /> Upon review Of the manu&cturing procedures mW the employment of the nataials used is <br /> the construction and installation of the Bravo Flex Boot system utilizing adhesive FRP pipe <br /> systems and UL epoxy coated stainles3stool hose clamps with isolatico sealant system,it <br /> is my opinion and conclusion that sound engineering design and engineering of this product <br /> will eliminate or provide isolation of the stainless steel hose clamp from the backfill in <br /> buried lines. <br /> The review and conclusion were made in accordance with the requirements of Sections <br /> 263 1(d)and 2636(b)listed above. <br /> ,iall <br /> Jaincs H.Ray <br /> Sr.Civil Engineer <br /> 1i WA INM A U1 I',j 1',1 1 A A <br /> A&I J'N�I i t A A I I , A7 V WA <br />