My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2010
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3940
>
2300 - Underground Storage Tank Program
>
PR0507837
>
COMPLIANCE INFO_2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2024 4:46:23 PM
Creation date
6/3/2020 9:59:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010
RECORD_ID
PR0507837
PE
2361
FACILITY_ID
FA0008057
FACILITY_NAME
TRACY TRUCK AND AUTO STOP
STREET_NUMBER
3940
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95304
APN
21220004
CURRENT_STATUS
01
SITE_LOCATION
3940 N TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0507837_3940 N TRACY_2010.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
348
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sep.14.2010 09:51 AM 0 0 PAGE. 1/ 3 <br /> W. ;H L A R ( pi I T F.c 1, 11 at' <br /> I` N C I N L P ft I N 1., N V I R 0 N M is N T A 1. F14 v I (,j. <br /> C1401110 INC. I j I M"11, 11, 'J' (707) <br /> iter ,, rotrrb rra 19s4 <br /> February 13,2001 REVISED Jmly 17,2001 <br /> S.Bravo Systems,Inc. <br /> 2929 Vail Avenue <br /> Commerce,CA 90040 <br /> ATT; Don Muka4 P,E. <br /> ToW, It It" RE: THIRD PARTY APPROVAL <br /> CCR Title 23,Division 3,Chapter 16 Sections.2631(d)and 2636(b) <br /> BRAVO FLEX BOOT SYSTEM UTILIZING ADHESIVE.PRP PIPE <br /> SYSTEM AND UL EPDXY COATED STAINLESS STEEL HOSE CLAMPS <br /> WITH ISOLATION SEALANT SYSTEM. <br /> CALIFORNIA WATER RESOURCES CONTROL BOARD LETTER <br /> DATED 11114/00 TO ALL LOCAL AGENCY UNDERGROUN STORAGE <br /> TANK PROGRAM MANAGERS AND CUPAS <br /> I have examined and reviewed the following items On the Bravo Protected steel clamps fbr <br /> use on boot systems used on buried Petroleum product fines: <br /> 11V Original Bravo Flex Boot System was third party approved by RHL Design on April 15, <br /> 1999. All materials approved in that approval are still valid with the exception of the <br /> modifications to provide isolation from the soil for the hose clamps and a method of <br /> bonding the flex boot directly to FRP pipe. <br /> 1. Bravo UL Epoxy Coated Stainless Steel Clamps. <br /> 2. Appendix#6B UL test reports on steel coating. <br /> 3. Appendix#9 Product information on Vulkem 116 Polyurethane Sealant. <br /> 4. Bravo installation instructions for clamp system installation. <br /> 5. Original Third Party approval letter and data on the Bravo Secondary Flex boot <br /> system dated April IS,1999. <br /> A A6. Chemical Expwure Teston S Bravo Systems' Flex Boot with FRP Pipe. Tested <br /> with both Ameron and A.O. Smith FRP bonded to Bravo Flex Boot. Test Report <br /> date 1131/2001, <br /> 7. National TwJWW System Fullerton Division Test Report Number 176-0728. <br /> Tau for Pressure Cycling and Burst. This test evaluated both the hose clamp <br /> "am and the direct bonding of the boot to FRP pipe and the boot itself. <br /> 19 on 41 11,1 1.11 1:V U 1,, WA L.n Ii Afsk.i. (,A 'Ni A It t llal Z, (.'A Vf I Ni LI!OA, (;A <br /> A A V VI It. WA <br />
The URL can be used to link to this page
Your browser does not support the video tag.