My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2011-2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3940
>
2300 - Underground Storage Tank Program
>
PR0507837
>
COMPLIANCE INFO_2011-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2024 4:52:42 PM
Creation date
6/3/2020 9:59:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011-2015
RECORD_ID
PR0507837
PE
2361
FACILITY_ID
FA0008057
FACILITY_NAME
TRACY TRUCK AND AUTO STOP
STREET_NUMBER
3940
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95304
APN
21220004
CURRENT_STATUS
01
SITE_LOCATION
3940 N TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0507837_3940 N TRACY_2011-2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
517
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mar.03.2012 02:37 PM RAWnvironmental 559 291#445 PAGE. 4/ 10 <br />I W <br />SWRCB, January 2002 <br />Test Method Developed By: <br />Test Method Used: <br />Test L-Auivment Used: 9 <br />14 <br />.11W.1 X61130)YA ve U N 411 <br />0 Piping Manufacturer rpndustry <br />[1 other (Specify) <br />9PPressure U Vacuum <br />11 Other Npecifv) <br />Page _ of <br />Standard U Professional Engineer <br />0 Hydrostatic <br />Equipment Resolution; <br />Comments :::�cludeins ' ation on repairs made plior to testing, and recomm!!Ld!L4 it/low-up for felled tests). <br />P=pj Run # <br />Piping kun i N�"m <br />Piping Run # <br />Piping izuz-",r#, <br />Piping Material: <br />Piping Manufacturer: <br />I I <br />oo'hc) <br />V, <br />t <br />Sv,-'4vl <br />A,b !4 <br />NJ <br />Piping Diameter <br />7'r <br />Length of Piping Run: <br />95, <br />95 <br />Product Stored: <br />Method and location of <br />Riping-run isolation. <br />— <br />ty <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />Test Start Time: <br />Initial Reading (R,): <br />96T <br />5,. 9 be <br />2,f2M <br />S 9 <br />Test End Time: <br />%-T <br />I -AC) <br />Final Reading (Pkp):bf-s <br />al <br />Test Duration; <br />ht, <br />I Vic <br />hT, <br />Change in Reading (Rh -R,): <br />(2.f)jj_ <br />0 P5 <br />0 IP6,T- <br />0 9-:51 <br />Pass/Fail Threshold or <br />Criteria: <br />Y1a <br />no <br />&cr—Av <br />Test Result: <br />Pas <br />0 Fail <br />ra Pas j <br />0 Fail <br />JPPass 0 Fail <br />nss ❑ C+ail <br />Comments :::�cludeins ' ation on repairs made plior to testing, and recomm!!Ld!L4 it/low-up for felled tests). <br />
The URL can be used to link to this page
Your browser does not support the video tag.