Laserfiche WebLink
Mar.03.2012 02:37 PM nvironmental 559 29 445 PAGE. 5/ 10 <br />SWRCB, January 2002 Page — of <br />6. PIPING SUMP TESTING <br />Test Method Developed By: <br />❑ Sump Manufacturer <br />Cl Industry Standard fl Professional (Engineer <br />❑ Other ftecify) <br />Test Method Used: <br />F1 Pressure <br />U Vacuum <br />U Hydrostatic <br />❑ Other (S,peclfy) <br />Test Equipment Used: <br />Equipment Resolution: <br />Sump # $ <br />Sump # Cl I <br />Sump #s�' <br />Sump daC'St+i- <br />Sump Ditunl:tCr: <br />It <br />e <br />Sump Depth: <br />Sump Material: <br />o <br />�� <br />Height from Tank Top to Top of <br />, e� <br />H <br />io <br />►e <br />t l <br />Highest Piping Penetration: <br />Height from Tank Top to Lowest <br />Electrical .Penetration: <br />Condition of sump prior to testing: <br />di CAV <br />Portion of Sump Tested'..- <br />1 e bote- <br />t ialm <br />Does turbine shut down when <br />LINA <br />sunup sensor detects liquid (both <br />❑ Yes ❑ No IPNA <br />U Yes UNo 4NA <br />I...)Yes 1j No VA <br />[Wos UNo <br />roclg t and water ?e <br />Turbine shutdown response time®A <br />Is system programmed for fail-safe <br />� <br />U Yes U No NA <br />❑ Yes n No 1PNA <br />❑ Yes ❑ No WA <br />U Yes 1.1 No <br />IRNA <br />shutdown'i <br />Was (Fail-safe verified to be <br />❑ Yes UNo ipNA <br />❑ Yes Cl No (OVA <br />❑ Yes ❑ No SENA <br />l7 Yes I.1 No <br />4NA <br />operational? _ <br />-aittime <br />between applying <br />pressure/vacuum/water and starting <br />test: <br />15 M i o <br />e✓ e <br />Test Start Time: <br />1 Q <br />.4", <br />0,C> <br />w <br />Initial Reading (RT): <br />„l�• <br />w1, 1 t <br />$Opl <br />.(043 <br />r <br />Test End Time: <br />la: f2b <br />Final heading (RF) - <br />1 <br />'3,909 <br />I <br />Test Duration: <br />` ; i1 <br />i <br />i <br />Change in Reading (RF -111): <br />.} �. i �� <br />f tt <br />"®• O® �� <br />•�®D° <br />Pas,s/FailThreshold orCriteria: <br />«p,p6� <br />-O. >&a <br />� Ott <br />'Fest Result: <br />ql Pass ❑ Fail <br />ass 0 Fail <br />APass ❑ Fail <br />Pass ❑ Fall <br />Was sensor removed for testing? -- <br />_ <br />i Yes n No ❑ NA <br />es UNo 1)NA <br />es ❑No ❑NA <br />. es I-INo <br />ON <br />Was sensor properly replaced and <br />Ives n No ❑ NA <br />*es, l.3 No I I NA <br />[! Yes ❑ 'No DNA <br />�D'es n No <br />❑ NA <br />verifted functional atter t in ? <br />Comments - (include information on repairs made frim to testin ,and recommended ollow-u or ailed texts) <br />s if the entire depth of the sump is not tested, specify how much was tested. if the answer to W of the questions indicated with an <br />asterisk(*) is "NO" or "NA", the entire sump must be tested. (See SWRCB LG -160) <br />M. <br />