Laserfiche WebLink
Mar.03.2012 02:38 PM nvironmental 559 29 445 PAGE. 6/ 10 <br />S W RCB, January 2002 Page — of <br />6. PIPIN' gFTMP TlF.I.R►TIN[r <br />Test Method Developed By: U Sump Manufacturer (Industry Standard U Professional Engineer <br />U Other (Spee) <br />'fest Method Used: C Pressure 0 Vacuum 1014ydrostatic <br />U Other (Specify) <br />Test Equipment Used: Equipment Resolution: 2,Q00 <br />Sump # ' <br />Sump # <br />5ump # <br />Sump # <br />Sump Diameter: JAIZt <br />' <br />Sump Depth: r @ r <br />r <br />Sump Material: <br />Height from Tank Top to Top of <br />Highest Piping Penetration: <br />Height from Tank Top to Lowest <br />Electrical Penetration: 1$ <br />Condition of sump prior to testing: i <br />Portion of Sump Tested' 'Q t' <br />_ <br />Does turbine shut down when <br />sump sensor detects liquid (both I I Yes L i No [ ONA <br />❑ Yes 0 No IONA <br />❑ Yes ❑ No 1:1 NA <br />(:I Yes O No fl NA <br />product and water)?. <br />Turbine shutdown response time A <br />y <br />Is system programm" ed for fail-safe <br />U Yes U No CPNA <br />[J Yes I I No IrDNA <br />Il Yes 0 No ❑ NA <br />0 Yes Li No [.I NA <br />Shutdown? <br />Was fail-safe verified to be ❑ Yes 0 No SIA <br />U Yes U No NNA <br />fl Yuq ❑ No DNA <br />❑ Yes U No 0 NA <br />operational?* <br />Wait time between applying <br />pressurelvacuum/water and starting <br />test: is yni <br />__. _.... <br />Test Start Time: y <br />', <br />M ,•^„ <br />Initial Reading (RI): S. 2716 <br />Test End Time: 1'. 4 <br />Final Reading (Rr);H <br />Test Duration: 9._ 1 <br />e <br />Change in Reading (RF -RI): '0.092 ..- <br />Pass/PailThresholdorCriteria: <br />Test Result-. 6b Pass 0 Fail <br />Pass tI Fail <br />U Pass ❑ Fail <br />0 Paas LI Fail <br />Was sensor removed for testing? -)Yes ❑ No DNA <br />5PYes F I No HNA <br />❑ Yes 0 No U NA <br />LiYes U No DNA <br />Was sensor properly replaced and Yes I :I No -U NA <br />4es 0 No U NA <br />❑ Yes ❑ No DNA <br />I .I Yes 1 I No ❑ NA <br />verified functional after testing? <br />Comments - (include information on repairs made prior to talin , and recommended nllr w-u� fur failed tests) <br />' Tf the entirc depth of the sump is not tested, Specify how much was tested. if the answor to my of the questions indicated with an <br />asterisk(*) is "NO" or "NA", the entire sump must be tested. (See SWRCB LG -160) <br />