My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2011-2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3940
>
2300 - Underground Storage Tank Program
>
PR0507837
>
COMPLIANCE INFO_2011-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2024 4:52:42 PM
Creation date
6/3/2020 9:59:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011-2015
RECORD_ID
PR0507837
PE
2361
FACILITY_ID
FA0008057
FACILITY_NAME
TRACY TRUCK AND AUTO STOP
STREET_NUMBER
3940
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95304
APN
21220004
CURRENT_STATUS
01
SITE_LOCATION
3940 N TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0507837_3940 N TRACY_2011-2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
517
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6 <br />a 0 0 <br />E - Backfill and Pouring the Concrete <br />ZMDo not remove Square caps from Rack sleeves until <br />after concrete has been poured and firmly set. <br />EA - Prepare site for concrete pouring. Backfill with peagravel around Vent Box, <br />noting the elevations of peagravel around <br />the box. Place your peagravel in such a way <br />that the concrete poured around the Vent Box <br />is even and within the dimensions shown in <br />Fig. E.I. <br />BRAVO SYSTEMS STATES INSTALLING <br />PERMANENT "BOLLARDS" (HEAVY POSTS) IS: <br />HIGHLY RECOMMENDED if Vent Transition <br />Sump is used for Vapor Vent Transition <br />MANDATORY! if Vent Transition Sump is <br />used for Product Transition <br />Fig. EA <br />M <br />E.2- Level concrete away <br />from Vent Box. If NOT <br />Cross installing rack system, do <br />Braces NOT remove the square caps <br />from the rack sleeves. Use <br />Vulkem to seal the caps to the <br />tops of the rack sleeves to <br />create a barrier for <br />moisture. <br />E.3 -After concrete has <br />_ I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />10" <br />45 5" <br />f <br />set, remove square caps from I <br />rack sleeves and assemble <br />rack system. Drop rack <br />system (RS500) into square tubing, or rack sleeves, secure, and <br />seal off rack cross/brace and fasteners with Vulkem Sealant. <br />(Fig. E.3) <br />E.4- Fasten to vent box. Install vertical riser pipe to appropriate <br />height, according to your local regulatory requirements. Secure <br />, pipes using pipe clamps to the rack system. <br />5 ii -B500/600 -SW -08B <br />
The URL can be used to link to this page
Your browser does not support the video tag.