Laserfiche WebLink
SWRCB,January 2002 Page 5. <br /> 7. UNDER-DISPENSER CONTAINMENT (UDC)TESTING <br /> Test Method Developed By: F1 UDC Manufacturer F-1 Industry Standard X❑ Professional Engineer <br /> El Other (Sped) <br /> Test Method Used: F] Pressure F Vacuum Hydrostatic <br /> Other (Specify) <br /> Test Equipment Used: vp l t Equipment Resolution: +-.0 0 2" <br /> UDC# 1/2 UDC# 3/4 UDC# 5/6 UDC# 7/8 <br /> UDC Manufacturer: unknown unknown unknown unknown <br /> UDC Material: fiberglass fiberglass fiberglass fiberglass <br /> UDC Depth: 1 30" 30" 30" 30" <br /> Height from UDC Top to Top of 1111 1111 1111 11'1 <br /> Highest Piping Pentration: <br /> Height from UDCTop to Lowest lit lit lit lit <br /> Electrical Pentration: <br /> Condition of UDC prior to testing: good good good good <br /> Portion of UDC Tested: 1 1311 1311 1311 1311 <br /> Does turbine shut down when <br /> sump sensor detects liquid(both X❑Yes�N�N MYes�N�N EYes❑N�N �Yes F]Noa <br /> product and water)?* <br /> Turbine shutdown response time: 2-5sec 2-5sec 2-5sec 2-5 s e c <br /> Is system programmed for fail-safe ❑ � ❑ � ❑ � ❑ <br /> shutdown?* X Yes N N X❑Yes N N X❑Yes N N X❑Yes No <br /> Was fail-safe verified to be <br /> operational?* I A IYes DNoONA MYes ONo[:]NA MYes❑No❑N EYes[]NoN <br /> Wait time between applying <br /> pressure/vacuum/water and starting 5min 5min 5min 5min <br /> test: <br /> Test Start Time: 11:37 11:58 11:56 11:37 <br /> Initial Reading(Rl): 0 0 0 0 <br /> Test End Time: 11:52 12 :13 12 :11 11:52 <br /> Final Reading(RF): - .0001" -.0003" -.0004" - .0012" <br /> Test Duration: 15min 15min 15min 15min <br /> Change in Reading(R F-Ri ): -.00011, -.0003" - .000411 -.0012" <br /> Pass/Fail Threshold or Criteria: +-.00211 +-.00211 +- .00211 +-.00211 <br /> Was sensor removed for testing? X YesE]N NA X Yes N NA -- Yes❑N NA E Yes F]No <br /> Was sensor properly replaced and FX]I,eC]Nc❑NA sE:]Nc❑NA L fi j NA EYes allo�N <br /> verified functional after testing? <br /> Comments- (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> 1 If the entire depth of the UDC is not tested,specify how much was tested.If the answer to-any of the questions indicated with an <br /> asterisk(*)is"NO" or"NA",the entire UDC must be tested. (See SWRCB LG-160) <br />