Laserfiche WebLink
SWRCB,January 2002 Page 4. <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: ❑ Sump Manufacturer F-1 Industry Standard Professional Engineer <br /> El Other (Specify) <br /> Test Method Used: F1 Pressure F] Vacuum Hydrostatic <br /> 0 Other (Spec) <br /> Test Equipment Used: 7p1t Equipment Resolution: +-.002 <br /> Sump# 1 SUP Sump# 2 UNL Sump# Sump# <br /> Sump Diameter: 4811 4811 <br /> Sump Depth: 7811 7811 <br /> Sump Material: fiberglass fiberglass <br /> Height from Tank Top to Top of 1511 1511 <br /> Highest Piping Pentration: <br /> Height from Tank Top to Lowest 3 5" 3511 <br /> Electrical Pentration: <br /> Condition of sump prior to testing: good good <br /> Portion of Sump Tested: 1 1711 1711 <br /> Does turbine shut down when <br /> sump sensor detects liquid(both XMYes❑N ]N ayes�N�N [:]Yes❑N�N Yes❑No�T <br /> product and water)?* <br /> Turbine shutdown response time: 2-5 s e c 2-5 s e c <br /> Is system programmed for fail-safe F,-1 <br /> [:] <br /> `� ❑ ❑ [7]No[— ❑ ❑ �T <br /> shutdown?* Yes N N X Yes N N Yes N N Yes No <br /> Was fail-safe verified to be ❑ � ❑ ❑ `� ❑ <br /> operational?* ElYes N N X Yes N N x❑ [:]N Yes N X Yes No <br /> Wait time between applying <br /> pressure/vacuum/water and starting 5min 5min <br /> test: <br /> Test Start Time: 10:0 0 9:3 0 <br /> Initial Reading(Rl): 0 0 <br /> Test End Time: 10:3 0 10:00 <br /> Final Reading(RF): -.001611 -.0005" <br /> Test Duration: 3 Omin 3 Omin <br /> Change in Reading(R F-Rl ): - .001611 -.0005" <br /> Pass/Fail Threshold or Criteria: +- .00211 +-.00211 <br /> Was sensor removed for testing? X YesENo❑NA MYes❑No❑NA E]YesF�No❑NA❑YesNo[,NN <br /> Was sensor properly replaced and � ❑ � ❑ ❑ T <br /> verified functional after testing? �Ye�N NA Ye N NA Ye N NA Yes N <br /> Comments - (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> 1 If the entire depth of the sump is not tested,specify how much was tested.If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />