My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2012-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3355
>
2300 - Underground Storage Tank Program
>
PR0508352
>
COMPLIANCE INFO_2012-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2021 9:09:56 AM
Creation date
6/3/2020 9:59:38 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2012-2018
RECORD_ID
PR0508352
PE
2361
FACILITY_ID
FA0008044
FACILITY_NAME
CHEVRON STATION #1731*
STREET_NUMBER
3355
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95212
APN
12618007
CURRENT_STATUS
01
SITE_LOCATION
3355 E HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0508352_3355 E HAMMER_2012-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
492
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JULRECT 201 <br />5. SECONDARY PIPE TESTING <br />Test Method Developed By: ❑ Piping Manufacturer 0 Industry Standard ❑ Professional Engineer <br />❑ Other (Spec) <br />Test Method Used: ❑✓ Pressure ❑ Vacuum ❑ Hydrostatic <br />❑ Other (Spec) <br />Test Equipment Used: See attached testing procedures <br />Piping Run # 87 Piping Run # 91 <br />Equipment Resolution: PSI <br />Piping Run # <br />Piping Run # <br />Piping Material: Fiberglass Fiberglass <br />Piping Manufacturer: AO Smith AO Smith <br />Piping Diameter: 3" 3" <br />Length of Piping Run: Appx. 150' Appx 150' <br />Product Stored: Gas 87 Gas 91 <br />Method and location of <br />i in -run isolation: Test Boot in Sump Test Boot in Sump <br />Test Boot in Sump <br />Test Boot in Sump <br />Wait time between applying <br />pressure/vacuum/water and 15 minutes 15 minutes <br />starting test: <br />15 minutes <br />15 minutes <br />Test Start Time: 9:00am 9:00am <br />Initial Reading (RI): 5 PSI 5 PSI <br />PSI <br />PSI <br />Test End Time: 10:00am 10:00am <br />Final Reading (RF): 5 PSI 5 PSI <br />PSI <br />PSI <br />Test Duration: 1 hour 1 hour <br />1 hour <br />1 hour <br />Change in Reading (RF -R,): 0 0 <br />Pass/Fail Threshold or 0 0 <br />Criteria: <br />Test Result: ®Pass ❑Fail OPass ❑Fail []Pass ❑Fail ❑Pass ❑Fail <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.