My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2012-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3355
>
2300 - Underground Storage Tank Program
>
PR0508352
>
COMPLIANCE INFO_2012-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2021 9:09:56 AM
Creation date
6/3/2020 9:59:38 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2012-2018
RECORD_ID
PR0508352
PE
2361
FACILITY_ID
FA0008044
FACILITY_NAME
CHEVRON STATION #1731*
STREET_NUMBER
3355
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95212
APN
12618007
CURRENT_STATUS
01
SITE_LOCATION
3355 E HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0508352_3355 E HAMMER_2012-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
492
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11 <br />Test Method Developed By: <br />❑ Sump Manufacturer ❑✓ Industry Standard ❑ Professional Engineer <br />❑ Other (Spec) <br />Test Method Used: <br />® Pressure <br />❑ Other (Spec) <br />❑ Vacuum <br />Hydrostatic <br />Test Equipment Used: See attached testing procedures <br />Sump # 87 <br />Sump # 91 <br />Equipment Resolution: Inches <br />Sump # Sump # <br />Sump Diameter: <br />48" <br />48" <br />Sump Depth: <br />63" <br />63" <br />Sump Material: <br />Fiberglass <br />Fiberglass <br />Height from Tank Top to Top of <br />Hi est Piping Penetration: <br />12" <br />12" <br />Height from Tank Top to Lowest <br />Electrical Penetration: <br />24" <br />24" <br />Condition of sump prior to testing: <br />Fair <br />Fair <br />Fair <br />Fair <br />Portion of Sump Tested' <br />Above highest penetration <br />Above highest penetration Above highest penetration Above highest penetration <br />Does turbine shut down when <br />sump sensor detects liquid (both <br />roduct and water)?* <br />[]Yes No NA <br />[]Yes No ❑NA <br />[]Yes[] No ❑NA <br />[IYes Flo []NA <br />Turbine shutdown response time <br />N/A <br />N/A <br />N/A <br />N/A <br />Is system programmed for fail-safe <br />shutdown?" <br />❑Yes ❑No " NA <br />❑ Yes o R1 NA <br />❑ Yes[] No [INA <br />❑ Yes []No [INA <br />s fail-safe <br />Was fail-safe verified to be <br />operational?* <br />❑Yes []No ❑� NA <br />❑� Yes ❑No RINA <br />❑Yes []No ❑NA <br />❑ Yes ❑No ❑NA <br />Wait time between applying <br />pressure/vacuum/water and starting <br />test: <br />15 minutes <br />15 minutes <br />15 minutes <br />15 minutes <br />Test Start Time: <br />9:53am <br />9:53am <br />Initial Reading (RI): <br />0.30720 Inches <br />1.00363 Inches <br />Inches <br />Inches <br />Test End Time: <br />10:08am <br />10:08am <br />Final Reading (RF): <br />0.30748 Inches <br />1.00373 Inches <br />Inches <br />Inches <br />Test Duration: <br />15 mins <br />15 mins <br />15 mins <br />15 mins <br />Change in Reading (RF -RI): <br />0.00028 <br />0.00010 <br />Pass/Fail Threshold or Criteria: <br />.002 <br />.002 <br />Test Result: <br />RIPass ❑Fail <br />❑✓ Pass OFail <br />[--]Pass ❑Fail <br />❑Pass ❑Fail <br />Was sensor removed for testing? <br />❑✓ Yes []No [:INA <br />✓❑Yes []No [:INA <br />[:]Yes ❑No []NA <br />❑ Yes []No [_]NA <br />Was sensor properly replaced and ❑Yes ®No ❑NA I R1 Yes ❑No []NA ❑Yes No ❑NA ❑Yes ❑No []NA <br />verified functional after testing? <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.