Laserfiche WebLink
0 <br />REQ�IVED <br />f 3 <br />jUL 2 9 2013 <br />7. UNDER -DISPENSER CONTAINMENT (UDC) TESTING <br />1 <br />Test Method Developed By: <br />❑ UDC Manufacturer ® Industry Standard ❑ Profe <br />��if�IE <br />❑ Other (Spec) <br />Test Method Used: <br />❑ Pressure <br />❑ Vacuum <br />® Hydrostatic <br />❑ Other (Specify) <br />Test Equipment Used: See attached testing procedures. <br />Equipment Resolution: <br />UDC#7/8 <br />UDC# <br />UDC# <br />UDC# <br />UDC Manufacturer: <br />UDC Material: <br />Fiber lass <br />UDC Depth: <br />30" <br />Height from UDC Bottom to Top <br />8" <br />of Highest Piping Penetration: <br />Height from UDC Bottom to <br />5" <br />Lowest Electrical Penetration: <br />Condition of UDC prior to <br />Fair <br />testing: <br />Portion of UDC Tested <br />Above highest <br />Above highest <br />Above highest <br />Above highest <br />penetration <br />penetration <br />penetration <br />penetration <br />Does turbine shut down when <br />UDC sensor detects liquid (both <br />❑ Yes ❑ No ® NA <br />❑Yes ❑ No ® NA <br />❑ Yes ❑ No ® NA <br />❑ Yes ❑ No ® NA <br />product and water)?* <br />Turbine shutdown response time <br />ystem programmed for fail- <br />shutdown?* <br />Yes No NA <br />❑ ❑ ® <br />❑Yes ❑ No ®NA <br />F1 Yes ❑ No ®NA <br />❑Yes ❑ No ®NA <br />Lsafe <br />s fail-safe verified to be <br />El Yes ❑ No ®NA <br />❑Yes ❑ No ® NA <br />❑ Yes ❑ No ® NA <br />❑ Yes ❑ No ®NA <br />rational?M <br />Wait time between applying <br />pressure/vacuum/water and <br />30 minutes <br />30 minutes <br />30 minutes <br />30 minutes <br />starting test <br />Test Start Time: <br />9:21am <br />Initial Reading (Ri): <br />4.5516 <br />Test End Time: <br />9:36am <br />Final Reading (RF): <br />4.5530 <br />Test Duration: <br />15 min <br />15 min <br />15 min <br />15 min <br />Change in Reading (RF-Ri): <br />0.00144 <br />Pass/Fail Threshold or Criteria: <br />0.002 <br />0.002 <br />0.002 <br />0.002 <br />Steslt K "";,.' .�; ...,.�a$� ❑ Fa>;i=..�".a5Sali'+ <br />Was sensor removed for testing? <br />®Yes [:]No ❑ NA <br />®Yes [:]No [:]NA <br />®Yes [:]No ❑ NA <br />®Yes [:]No ❑ NAG <br />Was sensor properly replaced and <br />®Yes [:]No ❑ NA <br />®Yes [:]No [:INA <br />®Yes ❑No El NA <br />El ❑No NA <br />verified functional after testing? <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />i If the entire depth of the UDC is not tested, specify how much was tested. If the answer to ggy of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire UDC must be tested. (See SWRCB LG -160) <br />