Laserfiche WebLink
MONITCVING SYSTEM CERTIFfATION <br />SEP 21 2015 <br />CERTIFICATION / TEST DATE: September 11, 2015 9nlr®IRnN11ACAl <br />A1. FACILITY A2. OWNER -a, -13 na <br />Name Teichert Mobile Equipment Name Teichert Construction <br />Address 120 Frank Circle, Stockton, CA 95206 Address P.O. Box 15002, Sacramento, CA 95851 <br />Phone # 916-366-8631 Phone # 916-386-3767 <br />Contact Steve Schamaun I L Contact Steve Schamaun <br />F. IN -TANK GAUGING / SIR EQUIPMENT: ■ Check this box if tank gauging is used only for Inventory control. <br />❑ Check this box if no tank gauging or SIR equipment is installed. <br />This section must be completed if in -tank gaugung equipment is used to perform leak detection monitoring. <br />Complete the following checklist: <br />■ <br />Yes <br />❑ <br />No* <br />Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />■ <br />Yes <br />❑ <br />No * <br />Were ail tank gauging probes visually inspected for damage and residue buildup? <br />■ <br />Yes <br />❑ <br />No* <br />Was accuracy of system product level readings tested? <br />■ <br />Yes <br />❑ <br />No* <br />Was accuracy of system water level readings tested? <br />Were all probes reinstalled properly? <br />■ Yes ❑ No* <br />■ <br />Yes <br />tEl <br />No * <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />* In Section H below, describe how and when these deficiencies were or will be corrected. <br />G. LINE LEAK DETECTORS (LLD): ❑ Check this box if LLDs are not installed. <br />Complete the following checklist: <br />■ Yes <br />❑ No* For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br />❑ N/A (check all that apply) Simulated leak rate: ■ 3 g.p.h.; ❑ 0.1 g.p.h.; ❑ 0.2 g.p.h. <br />■ Yes <br />❑ No* I Were all LLDs confirmed operational and accurate within regulatory requirements? <br />■ Yes ❑ No * Was the testing apparatus properly calibrated? <br />❑ Yes ❑ No* For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />■ N/A <br />■ Yes ❑ No* For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />❑ N/A <br />■ Yes ❑ No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br />❑ N/A or disconnected? <br />■ Yes ❑ No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions <br />❑ N/A or fails a test? <br />■ Yes ❑ No* For electronic LLDs, have all accessible wiring connections been visually inspected? <br />❑ N/A <br />■ Yes <br />❑ No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />* In Section H below, describe how and when these deficiencies were or will be corrected. <br />Page 3 of 3 <br />