Laserfiche WebLink
SWRCB,January 2002 Page_of <br /> 5. SECONDARY PIPE TES <br /> Test Method Developed By. X Piping Manufacturer 0 Industry Standard 0 Professional Engineer <br /> 0 Other(Specify) <br /> Test Method Used: X Pressure 0 Vacuum 0 Hydrostatic <br /> 0 Other(Specify) <br /> Test Equipment Used: Pressure Gauge Equipment Resolution:0-15 PSI <br /> Piping Run#1 Piping Run#2 Piping Run#3 Piping Run#4 <br /> Piping Material: Fiberglass Fiberglass Fiberglass Fiberglass <br /> Piping Manufacturer: Smith Smith Smith Smith <br /> Piping Diameter. 4" 4" 371 3T9 <br /> Length of Piping Run: 30' 30' 50' 40' <br /> Product Stored: Diesel Diesel Diesel Gas <br /> Method and location of Test boot Test boot Test boot Test boot <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 5 min 5 min 5 min 5 min <br /> starting test: <br /> Test Start Time: 9:20 9:20 8:45 8:45 <br /> Initial Reading W: 5 PSI 5 PSI 5 PSI 5 PSI <br /> Test End Time: 10:20 10:20 9:45 9:45 <br /> Final Reading(RF): 5 PSI 5 PSI 5 PSI 5 PSI <br /> Test Duration: I Hour I Hour I Hour I Hour <br /> Change in Reading(PF-N: 5 PSI 5 PSI 5 PSI 5 PSI <br /> Pass/Fail Threshold or 0 drop 0 drop 0 drop 0 drop <br /> CTest Result:riteria: x Pass 0 Fail x Pan ❑Fail x Pass 0 Fall x Pass 0 Fall <br /> Comments—(include information on repairs made prior to Msft and recommnqedollow-upfor faded tests)L <br /> v ED <br /> 16e1 'i Q qnJ7 <br /> ENVIROWAAENITAL WEN TW <br /> O'L RART-MENT <br />