My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2010-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FRANK WEST
>
120
>
2300 - Underground Storage Tank Program
>
PR0515365
>
COMPLIANCE INFO_2010-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2023 3:11:49 PM
Creation date
6/3/2020 9:59:44 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010-2018
RECORD_ID
PR0515365
PE
2361
FACILITY_ID
FA0012107
FACILITY_NAME
A TEICHERT & SON INC*
STREET_NUMBER
120
STREET_NAME
FRANK WEST
STREET_TYPE
CIR
City
STOCKTON
Zip
95206
APN
19342006
CURRENT_STATUS
01
SITE_LOCATION
120 FRANK WEST CIR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0515365_120 FRANK WEST_2010-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
439
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SV*rRCB,January 2002 Page of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By. X Piping Manufacturer 0 Industry Standard 0 Professional Engineer <br /> 0 Other(Specify) <br /> Test Method Used: X Pressure 0 Vacuum 0 Hydrostatic <br /> 0 Other(Specify) <br /> Test Equipment Used: Pressure Gauge Equipment Resolution:0-15 PSI <br /> I= Piping Run#5 Piping Run# Piping Run#3 Piping Run#4 <br /> Piping Material: Fiberglass <br /> Piping Manufacturer: Smith <br /> Piping Diameter: 4" <br /> Length of Piping Run: 40' <br /> Product Stored: Diesel <br /> Method and location of Test boot Test boot Test boot Test boot <br /> piping-ran isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 5 min 5 min 5 min 5 min <br /> starting test: <br /> Test Start Time: 8:45 <br /> Initial Reading(R4): 5 PSI <br /> Test End Time: 9:45 <br /> Final Reading(11F): 5 PSI <br /> Test Duration: I Hour I Hour I Hour I Hour <br /> Change in Reading(RF-RI): 5 PSI <br /> Pass/Fail Threshold or 0 drop 0 drop 0 drop 0 drop <br /> Criteria: <br /> Test Result: x Pass 0 Fail 0 Pass 0 Fail- 0 Pass 0 Fait 0 Pass 0 Fail <br /> COMMentS—(include information on repairs made prior to testi!& and recommended follow-up for failed tests) <br /> 1r— <br /> T r.D- <br /> jAN 13 ZU17 <br /> ENVIRONMENTAL HEAUFF- <br /> DEPARTMEW <br />
The URL can be used to link to this page
Your browser does not support the video tag.