Laserfiche WebLink
SWRCB,January 2002 Page_of <br /> 6. PIPING SUW TESTING <br /> Test Method Developed By. 0 Sump Manufacturer 0 Industry Standard X Professional Engineer <br /> 0 Other(Spedj) <br /> Test Method Used: 0 Pressure 0 Vacuum X Hydrostatic <br /> 0 Other(Specify) <br /> Test Equipment Used: Caldwell Systems Equipment Resolution: .005/30 min <br /> Sump 'Gas Sump#2 Diesel Sump#3 Diesel Sump# <br /> SE <br /> pDiam <br /> e <br /> ter. � <br /> 46146746" <br /> Sp Depth5477 5511 5771 <br /> Sup Material: <br /> Fiberglass Fiberglass Fiberglass <br /> Height from Tank to Top of 22 22" 1811 <br /> Highest Pi in <br /> Height from Tank Top to Lowest 2972 30" 2511 <br /> Electrical Penetration: <br /> Condition of sump prior to testing: Dry Dry Dry <br /> Portion of Sump Tested' 2"above Highest piping penetration <br /> Does turbine shut down when <br /> sump sensor detects liquid(both xYes ONo DNA xYes ONoONA x Yes 0 No 0 NA 0 Yes 0 No 0 NA <br /> roduct and water)?' <br /> Turbine shutdown response time <br /> Is system programmed for fail-safe x Yes 0 No 0 NA x Yes 0 No 0 NA x Yes 0 No 0 NA 0 Yes 0 No 0 NA <br /> shutdown?* <br /> Was fail-safe verified to be 0 Yes x No 0 NA 11 Yes x No 0 NA 0 Yes x No 0 NA 0 Yes 0 No 0 NA <br /> 2perational?' <br /> Wait time between applying <br /> pressure/vacuum/water and starting 5 min 5 min 5 min 5 min <br /> test: <br /> Test Start Time: 8:55 9:55 10:45 <br /> Initial Reading(RO: .001, .0019 .001, .001, <br /> Test End Time: 9:25 10:25 11:15 <br /> Final Reading(RF): .00 .00 .00 <br /> Test Duration: 30 min 30 min 30 min 30 min <br /> Change in Reading(RF-R4): .00 .00 .00 <br /> Pass/Fail Threshold or Criteria: .005/30 min .005/30 min .005/30 min .005/30 min <br /> Test Result x Pass 0 Fait x Pass 0 Fail x Pass 0 Fail 0 Pass 0 Fail <br /> Was sensor removed for testing? x Yes 0 No 0 NA x Yes 0 No 0 NA x Yes 0 No 0 NA 0 Yes 0 No 0 NA <br /> Was sensor properly replaced and xYes ONo DNA , x Yes 0 No 0 NA x Yes 0 No O,NA 0 Yes 0 No 0 NA <br /> verified functional <br /> CommentS—(include information on re <br /> pairs made prior to lafing, and recommended follow-u r d <br /> �u fo faile tests mom <br /> D P rl:-- I XIEL" <br /> I a LMM 114"Ov A- 9 V <br /> j A 1-3 2017 <br /> r:KixnPnNME-NTAL H ALTH <br /> DEPARTMENT <br /> If the entire depth of the sump is not tested,specify how much was tested. If the answer to My of the questions indicated with an <br /> asterisk(*)is"ATO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />