Laserfiche WebLink
SWRCB,January 2002 Page____of <br /> a <br /> 5. SECONDARY <br /> { <br /> Ted Method Developedy: X Piping Manubcaua 0 lachuary Sandard ❑Professional <br /> a Other Apec6) <br /> ° <br /> Ted Method Used- X Pressure 0 Vacuum Hydrostudc <br /> ❑Odw f1') <br /> Test Equhnnew Used: Pressure,Gaw Equipment Resolution.0-15 PSI <br /> Piping n#1 Piping Run 2 Piping Ron#3 Piping Run#4 <br /> Piping Material: Filnglass Fi Fe Fiberglass, <br /> Piping Murnifimum: _ Smith Smith Smith ° <br /> Pip' 4" 4" 3" 3" <br /> Length of Pip' 30' 30' S0' ' <br /> 3Product <br /> 3 l Diesel Diesel <br /> Method and location of <br /> Ted boot Tea boot Test boot Ted boot <br /> iWait" <br /> pressuaWvacuumhviater d S min S min S min S min <br /> starting tat <br /> Tog Start Time: 9:20 920 8:45 8:45 <br /> Initial Reaft S PSI S PSI S PSI S PSI <br /> Ted End T° 1020 1020 9:45 9:45 <br /> F' (k): 5 PSI 5 PSI S PSI S PSI <br /> Test Duratiow 1Hour 1 Hour 1 Hour 1 Hour <br /> Change in S PSI S PSI 5 PSI S PSI <br /> Threshold or 0 drop 0 drop 0 drop 0 drop <br /> k <br /> I Paw ❑ : is 0 Fall x Put ❑FkU x Pam ❑Fail <br /> comments—Andude Warmation on MIn made pwr to LeLUS and r dfollo farfaiied testI2 <br /> : LP 0 5 201? <br /> ",Z.2a, UEUT <br />