Laserfiche WebLink
SWRCB,Jmwy 2002 page of <br /> 6. PIPING SUNW TESTING <br /> } <br /> Test Method DevelopedBy; D Sump ManuflicamQ Industry Standard X Professional Engineer <br /> DOdier ifY) <br /> Ted Method Used: 0 Pressure 0 Vacuum X Hydrostatic <br /> Q DIY) <br /> Test Eqgpment U SyMms Equipment Resolution: . 5130 min <br /> Sump 4 Was Sump2 Diesel S=P#3 Diesel Sn <br /> { S . 88 46„ q L!! <br /> Sump Depfix98 55- Y5Q7„ <br /> Sump MweriaL. Fiberglm Fiberglass Filierglm <br /> Height from Tank Top t0 Top of „ 22" 18A <br /> H° <br /> °Hei&from Tank Top to Lowest29g' 30" 25" <br /> Electrical Peneftsdow <br /> Condition of sump prior to testing: Dry Dry Dry <br /> Portion of Swnp TOM& r above -Highest <br /> sensorDoes turbine shut down when <br /> sump detcM 1° x Yes ❑No ❑NA x Yes ® [INA xYes ONO ONA ❑Yes ❑Na ❑ A <br /> product and ?. <br /> Turbine shutdown response time <br /> Is sYftm Programmed for foil-safe --- <br /> 3 <br /> .y x Y ❑ o ❑ x Yes ❑ Q NA x Yes ❑ ❑ A ❑Yes Q No ❑NA <br /> W fe vaffied?* to be <br /> oper11 Yes x o ❑ A []Yes x o DNA ❑Yes x o D D Yes Q ONA <br /> wait . <br /> nia between applying <br /> 5 min 5 min 5 min 5 min <br /> Test Start Time: 8:55 9:55 10:45 <br /> bitial Reading(k): .00" „ ” <br /> .00 <br /> Test End Time: 925 10:25 11:15 <br /> F' 00 .00 <br /> T 30 min 30 min 30 min 30 min <br /> ReadingChange in <br /> Id or 5130 min .005/30 min .005/30 5130 min <br /> Was sensor removed for <br /> x Yes ❑No D NA xYm ❑ o [INA x Yes d No [INA ❑Yes ONo ONA <br /> r <br /> Was sensor Propertyreplaced and <br /> verified 1 after x Yes ❑No Q NA x Yes ❑ OKA x Yes oNo ❑NA D Yes ❑No [INA] <br /> ® e -(incl e i anon on re s ar ®r to tes ' a l r ailed t <br /> as <br /> .,n <br /> ;-j;,,,_a �l <}x <br /> HE H <br /> 7-7- ,f . i"?n!7 ,t1 <br /> 1 If the enure depth of the sump is not tested,specify how mu6 was tested. If the answer to Sy of the gmtions indicted with an <br /> asterisk(*)is"NO"or" A must be Wsftd. (see SWpcB LG-160) <br /> i <br />