My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2010-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FRANK WEST
>
120
>
2300 - Underground Storage Tank Program
>
PR0515365
>
COMPLIANCE INFO_2010-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2023 3:11:49 PM
Creation date
6/3/2020 9:59:44 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010-2018
RECORD_ID
PR0515365
PE
2361
FACILITY_ID
FA0012107
FACILITY_NAME
A TEICHERT & SON INC*
STREET_NUMBER
120
STREET_NAME
FRANK WEST
STREET_TYPE
CIR
City
STOCKTON
Zip
95206
APN
19342006
CURRENT_STATUS
01
SITE_LOCATION
120 FRANK WEST CIR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0515365_120 FRANK WEST_2010-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
439
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page___,_of <br /> 7. C <br /> Test Madkod Developed By. ❑UDC Manufilcturer, ❑hxluoy Standard X Professional <br /> 0 00M ) <br /> Ton Madiod Used: ❑Pressum Vacuum X Hydrostatic <br /> ® #) <br /> Test Equipment Used: Caldwell Systems <br /> Equipment so on: .005/30 min <br /> #1k2 UDC#3&4 UDC 9 UDCM <br /> UDC MmmfiKtmw. western western <br /> LTDC Material; MerglassF s <br /> 32" 33" <br /> HeigM ftom UDC Bottom to Top 12" 1299 <br /> of Hkhest Piping Penetration: <br /> 'Hei&from UDC Bottom to 14" 15" <br /> LAnvest Electrical Penctratim- <br /> Condition <br /> of UDC prior to Dry Dry <br /> Pordw of UDC Tdaedr 2"above piping Penetration <br /> Does tutbine ut down who <br /> x Yes ❑ o ❑ x Y ❑ ❑ O Yes p ❑ Oyes ❑ ❑NQ <br /> ?® <br /> Turbine dotdown response dw <br /> Is system programmed for x Yes 0 o DNA x Yes ❑No 0 NA 0 Yes 0o [INA OYes ONo DNA <br /> Was to be 0 Yes x No D NA 0 Yes xNo DNA Q Yes DNb OKA 0 Yes 0 No ❑NA <br /> Wait time between applying <br /> pressure/vacuumhYater and S min S min 5 min 5 min <br /> test <br /> Test Start Time: 9: 9:05 <br /> Initial Reading(U: W or " ----70-0- <br /> Tea Time: 9:30 9:35 <br /> Final <br /> Test Duratiow 30 30 min 30 30 min <br /> o in .00 .00 <br /> Id or 5/30 min .005/34 5/30 min .005/30 min <br /> Test : Paz 0 Fan z Pass 0 Faff ❑ Pan 0 F&H ❑ pan 13 Fan <br /> x Yes D No ❑NA x Yes Q No DNA x Yes DNo DNA x Yes 0 No 0 NA <br /> Was sensor propedy x Yes 0o 0 N xYes 0140 DNA x Yes Q No 0 NA xYes ❑ CNA <br /> CO en — on on s r to t d foA for failed test) <br /> isV L. <br /> , <br /> SFF 0 5 Z017 <br /> ,TAL HEAT <br /> �l ENT <br /> If the entire depth of the UDC is not tested,specify how much was teed. If the answer to gray of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire UDC must be tested. (See SWRCB LO-160) <br /> t <br />
The URL can be used to link to this page
Your browser does not support the video tag.