Laserfiche WebLink
• 04/18/2000 10:30 20946e3611 <br />1sT SYSTEM DRAW140 INFORMATICN <br />1. <br />2. <br />3. <br />4. <br />5. <br />6. <br />7. <br />FIFTH FLOOR <br />PAGE 06 <br />TANK 0 <br />Three Complete sets of plans (include manufacturer's specification sheets for proposod equipment to be installed). <br />k <br />r00 <br />Piens drawn to scale in non-eresatle print. <br />CAPACITY <br />CO 0A), <br />Plot plan to show location of tanks and all associated piping. <br />%D a.;, <br />_ <br />Striker places or drop tube -mounted bottom protectors illustrated below all accessible openings. <br />10 f G <br />GG • <br />Tank cross-sectional diagram. <br />F` sa /.ass <br />f�6�t drss <br />Detail of tank, associated piping, excavation and cover. <br />MODEL <br />Y <br />Tank(s) and piping approved by a nationally recognized independent testing organization. (Title 23, <br />Chapter 16, <br />PRODUCT <br />Article 3, Section 2631 (b) & 2635; <br />verification of product compatibility with the tank(s). piping, monitoring <br />i!S`¢ /Ass <br />r��6gf�asE <br />device(s), epoxy or silicone glues, etc. <br />U.L. LISTED <br />�•`A <br />Manufacturer's Written installation instructions for tank(s), piping, mnitoring devices, etc. <br />63 <br />COMPATIBILITY WITH 100% <br />METHANOL <br />At the installation site, prior to instattation, a tightness test shall be performed on both primary <br />(10) and <br />secondary (2°) containment systems before covering. (Section 2635 (a) (3) & (4)I <br />Tank integrity test required upon completion of installation with tank in operating condition. Test <br />results to be <br />submitted directly to PHS-EHO from the testing company or owner of facility. (Health b safety Code, <br />Division 20, <br />Chapter 6.7, Section 25291 (h)I <br />T.Yr <br />MWOAerTnAY <br />TANK 0 <br />� � <br />k <br />r00 <br />CAPACITY <br />CO 0A), <br />C, <br />%D a.;, <br />MANUFACTURER <br />1N/aier <br />10 f G <br />GG • <br />COMPOSITION <br />F` sa /.ass <br />f�6�t drss <br />Fs%e /M s,s <br />MODEL <br />w7_ 7 EII <br />PRODUCT <br />l <br />CORROSION PROTECTION <br />i!S`¢ /Ass <br />r��6gf�asE <br />�i6EB �il� <br />U.L. LISTED <br />�•`A <br />Ef <br />63 <br />COMPATIBILITY WITH 100% <br />METHANOL <br />v J <br />v <br />13. TANK(s) TO 6E iNSTALLED <br />A. Steet•clad with fiberglass reinforced plastic coatings, composites, or equivalent ran -metallic exterior <br />^" coatings or coverings. <br />(1) Tested at the installation site using an electric resistance holiday detector. <br />(2) vacuum applied to interstitial space. <br />8. Fiberglass <br />(1) installation instructions require an air test and soap bubble test prior to installation. <br />(2) vacuum applied to interstitial space. <br />(3) Hydrostatic annular (primary tank pressure test). <br />C. Non -clad steel tank (Section 2635 (o) (2) (A)) <br />(1) Cathodic protection provided for entire tank, piping and components (nuts, bolts, washers, <br />etc.). <br />_ (2) Field instatled cathodic protection systems designed and certified as adequate by a <br />corrosion specialist. <br />(3) Impressed current systems to be inspected no less than every 60 days. <br />5 <br />