Laserfiche WebLink
04/1312000 10:30 20946834"" FIFTH FLOOR PAGE 07 <br />M <br />15. <br />INTERSTITIAL SPACE MON(TORINd <br />A. visual monitoring (section 2632 cc) (1)) <br />(a) Exterior surface and floor beneath tank monitored by direct viewing <br />(b) Daily visual inspections <br />(c) liquid level in tank to be recorded at time of inspection Tl - 5- 35-0 <br />(d) If liquid observed around or beneath primary tank, owner wit/ determine if an unauthorized release <br />has occurred. <br />B, Mechanical or electronic monitoring [Section 2632 (c) (2)] <br />(a} continuous monitoring system connected to an ®edible and visugt alarm system. <br />Monitoring equipment to be instatteed�{� <br />manufacturer:___,��r`r� <br />Model Number: <br />Sensor Type: ® Vapor liquid ® Both. <br />Sensor/Panel specifications. <br />lecation(s) forsors: �i <br />.�_ Tank. 1C piping:. /�-�!. <br />Dispenser• �`+� ^—T <br />C. Monitoring and response plan submitted [section 2632 (d) (1) & (2)), <br />Any special accessories, fittings, coatings, or tinings not inherent within the initial design of the 10 tank or <br />doubte-watl UST. [section 2631 (b)) <br />A. Approved by a nationalty recognized independent testing organization. <br />s. Demonstration of integrity with the primary andfor secondary containment. <br />2 <br />D . Alternate constrL_ ion for new underground storage tanks conta,..,ng motor vehictes Net [section 26331. <br />(1) <br />Monitoring and response plan [Section 26341. <br />(2) <br />Underground storage tank composed of.... <br />(a) Fiberglass reinforced plastic. <br />(b) Cathadicalty protected steel. <br />(c) Steel clad with fiberglass reinforced plastic. <br />(d) other nateriat that compties with section 2631 and 2632. <br />(3) <br />Floor of leak interception and detection system constructed on a firm base and sloped to a <br />collection sump (use of membrane Liners comply with section 2631 (d) (6) requirements.) <br />(4) <br />Access casings instatted in the collection sump of the secondary containment system with <br />backfill in the interstitia[ space. The access casing shall meet all of the follawing: <br />Designed and installed to allow the liquid to flow into the casing. <br />_ <br />sited ;o aticw removat of cotlected liquid and able to withstand all anticipated applied <br />stresses. <br />Constructed of material that will not be structurallY weakened. <br />Screened along entire vertical zone of permeable material. <br />Capable of preventing leakage of any hazardous substance from the casing. <br />Extend to the ground surface and covered with a tacked waterproof cap. <br />Capable of meeting S.J. Co. PHS-EHD Wetl Standards. <br />leak interception and detection system shalt prevent the leaked hazardous substance from <br />_ <br />entering ground water. <br />INTERSTITIAL SPACE MON(TORINd <br />A. visual monitoring (section 2632 cc) (1)) <br />(a) Exterior surface and floor beneath tank monitored by direct viewing <br />(b) Daily visual inspections <br />(c) liquid level in tank to be recorded at time of inspection Tl - 5- 35-0 <br />(d) If liquid observed around or beneath primary tank, owner wit/ determine if an unauthorized release <br />has occurred. <br />B, Mechanical or electronic monitoring [Section 2632 (c) (2)] <br />(a} continuous monitoring system connected to an ®edible and visugt alarm system. <br />Monitoring equipment to be instatteed�{� <br />manufacturer:___,��r`r� <br />Model Number: <br />Sensor Type: ® Vapor liquid ® Both. <br />Sensor/Panel specifications. <br />lecation(s) forsors: �i <br />.�_ Tank. 1C piping:. /�-�!. <br />Dispenser• �`+� ^—T <br />C. Monitoring and response plan submitted [section 2632 (d) (1) & (2)), <br />Any special accessories, fittings, coatings, or tinings not inherent within the initial design of the 10 tank or <br />doubte-watl UST. [section 2631 (b)) <br />A. Approved by a nationalty recognized independent testing organization. <br />s. Demonstration of integrity with the primary andfor secondary containment. <br />2 <br />