My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2010-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1330
>
2300 - Underground Storage Tank Program
>
PR0515864
>
COMPLIANCE INFO_2010-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2023 10:44:40 AM
Creation date
6/3/2020 10:00:02 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010-2018
RECORD_ID
PR0515864
PE
2361
FACILITY_ID
FA0012355
FACILITY_NAME
A&A GAS FOOD MART
STREET_NUMBER
1330
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
22120053
CURRENT_STATUS
01
SITE_LOCATION
1330 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0515864_1330 E YOSEMITE_2010-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
486
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROCRAM C'ONSOLIDA'FED VMM <br /> UNDERGROUND STORAGE TAN <br /> MONffORMG PLAN-(PaLe I of 2) <br /> TYPE OF ACTION ® 1.NEW PLAN ❑ 2.CHANGE OF INFORMATION 490-1. <br /> PLAN TYPE ❑ 1.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. 490-2• <br /> (Check one item only) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) 1. <br /> BUSINESS NAME(Same as Facility Name or DBA) Gas Depot 3 <br /> BUSINESS SITE ADDRESS 1330 E. Yosemite 77 <br /> Manteca 104. <br /> 1. EQUIPMENT'TESTING AND PREVENTIVE MAINTENANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must be performed at the frequency specified <br /> by the equipment manufacturers'instructions,or annually,whichever is more frequent Such work must be performed by qualified personnel.[23 CCR§2632,2634,2638,2641) <br /> moNrrORIN&EQUIPMENT IS SERVICED ® 1.ANNUALLY ❑ 99.OTHERS t 490.3a. <br /> Q ( Pce fy)• 490-3b. <br /> M. MONITORING LOCATIONS <br /> ❑ 1.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN ® 2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED [23 CCR§2632,2634] 490.4, <br /> IV. TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) (halteck app�lt <br /> 1.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) 490-5. <br /> WITH AUDIBLE AND VISUAL ALARMS.(23 cctt§2632,26341 <br /> SECONDARY CONTAINMENT IS: ® a.DRY ❑ b.LIQUID FILLED ❑ c.PRESSURIZED ❑ d.UNDER VACUUM 49"- <br /> PANEL MANUFACTURER: VeedeC Coot 490-7. MODEL#: TLS 350 490-8' <br /> LEAK SENSOR MANUFACTURER: VeedeC Coot 490-9. MODEL#(S): 409 490-10. <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S).(23 CCR§2643) 490-11. <br /> PANEL MANUFACTURER: 490-12. MODEL#: 490.13. <br /> IN-TANK PROBE MANUFACTURER: 490-14. MODEL#(S): 490-15. <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ c.WEEKLY 490-16. <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): 490-17' <br /> PROGRAMMED TESTS: ❑ a.0.1 h ❑ b.02 h. ❑ c.OTHER(Specify): 4`w 18' <br /> &P- &P• ( P �)� 490-19. <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION[23CCR§260-6.11 49x20• <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)123 ccR§26451 TESTING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS 4�90.21. <br /> ❑ S.TANK INTEGRITY TESTING PER 123 ccR§2643.11 490-23._ <br /> TEST FREQUENCY: Ela.ANNUALLY ❑ b.BIENNIALLY [I c.OT14ER(Specify): 4�4 -24' <br /> 490.26. <br /> ❑ <br /> 99.OTHER(Specify): 490-27. <br /> V. PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) t(CChtacka" <br /> ® 1.CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE&VISUAL ALARMS. 4W28- <br /> 123 CC <br /> 90-28•123CC SECONDARY CONTAINMENT IS: ® a DRY ❑ b.LIQUID FILLED ❑ c.PRESSURIZED [Id.UNDER VACUUM 490-29. <br /> PANEL MANUFACTURER:VeedeC Root 490-30. MODEL#: TLS 350 490-31. <br /> LEAK SENSOR MANUFACTURER: VeedeC Root 490-32. MODEL#(s): 352 STP's 1208 FSump 490.33. <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. ® a.YES ❑ b.NO 49x34. <br /> FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a.YES ❑ b.NO 490.35. <br /> ® 2.MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 g p.h.LEAK TESTS AND RESTRICTS OR SHUTS OFF 490-36. <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED.123 m§26361 <br /> MLLD MANUFACTURER(S):VMI 490.37. MODEL#(S): 99 LD 2000 490-38. <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS.(23 ccR§26361 490-39. <br /> ELLD MANUFACTURER(S); 490.40. MODEL#(S): 490-41. <br /> PROGRAMMED IN LINE LEAK TEST: ❑ a.MINIMUM MONTHLY 0.2 g p.h. ❑ b.MINIMUM ANNUAL 0.1 g p.h. 490-42• <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ❑ b.NO 49(143- <br /> ELLD FAILUREIDISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ❑ b.NO 490-44. <br /> ❑ 4.PIPE INTEGRITY TESTING. 490-45.- <br /> TEST FREQUENCY: ❑ a ANNUALLY Elb.EVERY 3 YEARS El c. <br /> c.OTHER(Specify) 49047, <br /> ❑ S.VISUAL PIPE MONITORING. 490-48' <br /> FREQUENCY: ❑ a.DAILY ❑ b.WEEKLY ❑ c.M[N.MONTHLY&EACH TIME SYSTEM OPERATED* 490-49. <br /> *Allowed for monitoring of unburied emergency&eneratar fuel pipipI only HSC§25281.5(b)(3) <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA-123 CCR§26Wav)l 490-50. <br /> ❑ 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM. 490-51. <br /> ❑ <br /> 99.OTHER(Specify) 49D-52. <br /> 490.53. <br /> UPCF UST-D 02/2007)-1/4 wwtv.unidocs org <br />
The URL can be used to link to this page
Your browser does not support the video tag.