Laserfiche WebLink
FIED PROGRAM CONSOLIDATED FOW <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN-(Page 2 of 2) <br /> VI.TINDER DISPENSER CONTAINMENT(UDC)MONITORING (Check <br /> jall <br /> UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) <br /> N 1.CONTINUOUS ELECTRONIC MONITORING ❑ 2.FLOAT AND CHAIN ASSEMBLY ❑ 3.ELECTRONIC STAND-ALONE 490-54a. <br /> ❑ 4.NO DISPENSERS ❑ 99.OTHER(Specify) 490-54b. <br /> LEAK MONITOR MANUFACTURER:Veeder Root 490-5". MODEL#:TLS-360 490.56. <br /> LEAK SENSOR MANUFACTURER Veeder Root 490-57' MODEL#(S):794380-322 490-59. <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS. N a YES ❑ b.NO 490-59. <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN. N a.YES ❑ b.NO 490-60. <br /> FAILUREIDISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. N a.YES ❑ b.NO 490-61' <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER ❑ a YES N b.NO 490-62- <br /> UDC CONSTRUCTION IS: N 1.SINGLE WALL ❑ 2.DOUBLE WALL 490-63. <br /> IF DOUBLE WALL: 490-64a. <br /> UDC INTERSTITIAL SPACE IS MONITORED BY: ❑ a.LIQUID ❑ b.PRESSURE ❑ c.VACUUM <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS. N a YES ❑ b.NO 490-64b. <br /> VII. PERIODIC SYSTEM TESTING <br /> ELD TESTING:THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 490-65. <br /> 1. <br /> LEAK DETECTION(ELD)MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED.I23 CCR§2644.q <br /> ® 6. <br /> 2.SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. 490-6 <br /> 490-67.7. <br /> N 3.SPILL BUCKETS ARE TESTED ANNUALLY. <br /> VRI. RECORD KEEPING <br /> The following monitoring/maintenanoe records are kept for this facility 0-90-6s. <br /> N a.ALARM LOGS ❑ b.VISUAL INSPECTION RECORDS ❑ c.TANK INTEGRITY TESTING RESULTS <br /> ❑ d.SIR TESTING RESULTS(and supporting documentation records) ❑ e.TANK GAUGING RESULTS(and supporting documentation records) <br /> ❑ f.ATG TESTING RESULTS(and supporting documentation records) ❑ g.CORROSION PROTECTION 60-DAY LOGS <br /> ® h.EQUIPMENT MAINTENANCE AND CALIBRATION RECORDS <br /> IX TRAINING <br /> ® Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to their job duties: 49"90-. <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) <br /> ® THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required) 490-69b. <br /> ® OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required) 490.69c. <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 490.69d. <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW 490-69e. <br /> ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND 490-69f <br /> STATISTICAL INVENTORY RECONCILIATION" 490-696 <br /> ❑ SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS" 490-69b <br /> ❑ OTHER(Specify): 490-691• <br /> N This facility has a"Designated UST Operator who has passed the California UST System Operator Exam administered by the International Code Council 490-70. <br /> (ICC). The "Designated UST Operator will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 <br /> days of hire.This training will include,but is not limited to,the following: <br /> ➢ Operation of the UST systems in a manner consistent with the facility's best management practices. <br /> ➢ The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan. <br /> ➢ The facility employee's role with regard to spills and overfills as specified in the facility's UST Response Plan. <br /> ➢ Name(s)of contact person(s)for emergencies and monitoring alarms. <br /> X. COMMENTS/ADDITIONAL INFORMATION <br /> Provide additional comments hem or indicate how many pages with additional information on specific monitoring procedures are attached to this plan. 4W71. <br /> T-1 87 and T-2 91 have overfill flappers.set at 96°/.,T-3 Diesel has a ball float with straight tube set at 90%. <br /> XL PERSONNEL RESPONSIBILITIES <br /> The UST Owner/Operator is responsible for ensuring that 1.)the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered <br /> by this plan occurs;2.)all conditions that indicate a possible release are investigated;and 3.)all monitoring records are maintained properly. <br /> THE FOLLOWING PERSONS)ARE RESPONSIBLE FOR PERFORMING THE MONITORING AND EQUIPMENT MAINTENANCE: <br /> NAME: Kevin Hur I. TITLE:Owner/Operator ago-73. <br /> a� <br /> NAME: 74 TITLE: <br /> 490 75. <br /> The Designated UST Operator shall perform a monthly visual inspection of the fa ility;provide a report to the owner/operator,and inform the owner/operator of any <br /> conditions that need Jbl!2!tjT action. <br /> XII. OWNER/OPERATOR SIGNATURE <br /> CERTIFICATION:I certify that the information provided herein is true and accurate to the best of my knowledge. <br /> APPLICANT SIGNATURE DATE: 490-77. <br /> dt) 7 <br /> PEPRESE477NG:❑1.Tuck ❑2.F D 3.Aml 've of Owner 490-76. <br /> 490-78' <br /> APPLICANT NAME(print): <br /> Kevin Hur APPLICANT TITLE: 490-79. <br /> UPCF UST-D(12/2007)-3/4 www.unldocs.org <br />