Laserfiche WebLink
5. SECONDARY PIPE TESTING Page )f: <br /> Test Method Developed By: ❑Piping Manufacturer ®Industry Standard ❑Professional Engineer <br /> D Other(Specify) <br /> Test Method Used: ®Pressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: See attached testing procedures Equipment Resolution: <br /> Piping Run# q,17 Piping Run# 9/ Piping Run# Piping Run# <br /> Piping Material: <br /> Piping Manufacturer: ,g 0 <br /> Piping Diameter: ` <br /> Length of Piping Run: <br /> Product Stored: { .7 ed,i j <br /> Method and location of <br /> piping-run isolation: <br /> Wait time between applying 30 minutes 30 minutes 30 minutes 30 minutes <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start Time: Z 7 9=Z 7 <br /> Initial Reading(Rr): S psi 5 psi psi psi <br /> Test End Time: d.' -2 ,7 <br /> / 7 <br /> Final Reading(RF): psi 'j psi psi psi <br /> Test Duration: 1 hour 1 hour 1 hour 1 hour <br /> Change in Reading(RF-Rj): 0 i'3 <br /> Pass/Fail Threshold or 0.00 0.00 0.00 0.00 <br /> Criteria: <br /> ' esi Result , Piss ❑^l�~'a�i.__ ®T'ass ❑Fait . ❑,:Pass_. ❑Fail;; ❑ pass ❑Fail <br /> Comments—(include information on repairs made prior to testing, and recommended follow-tip for•failed tests) <br /> 2015 <br />