Laserfiche WebLink
SWRCB,January 2002 Page of <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed.By: ❑Sump Manufacturer ❑Industry Standard D Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: ❑Pressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Spec6) <br /> Test Equipment Used:ELLDS Equipment Resolution: .0007 <br /> Sump it T 7 Sump# 9/ Sump# Sump# <br /> Sump Diameter: y _Y <br /> Sump Depth: <br /> Sump Material: <br /> Height from Tank Top to Top of <br /> Highest Piping Penetration: 1 -2- 11-1 <br /> Height from Tank Top to Lowest <br /> Electrical Penetration: 39 3 <br /> Condition of sump prior to testing: 0"k <br /> Portion of Sump Tested' 2"above highest 2"above highest 2"above highest 2"above highest <br /> penetration penetration penetration penetration <br /> Does turbine shut down when <br /> sump sensor detects liquid(both ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> product and water),)* <br /> Turbine shutdown response time N/A N/A N/A N/A <br /> Is system programmed for fail-safe ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No [INA ❑Yes ❑No ❑NA <br /> shutdown? <br /> Was fail-safe verified to be <br /> operational?* ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> Wait time between applying <br /> pressure/vacuum/water and starting 30 minutes 30 minutes 30 minutes 30 minutes <br /> test: <br /> Test Start Time: - /0-1150 <br /> Initial Reading(R): 2 . 9 7 o y 9 G 5'/ <br /> Test End Time: f/ C'S <br /> Final Reading(Rr): 2. 2(1`} 9 6- c <br /> Test Duration: 15 minutes 15 minutes 15 minutes 15 minutes <br /> Change in Reading(RF-RD: o 0.5,,T . 0 O ey/9 <br /> Pass/Fail Threshold or Criteria: 0.0020 0.0020 0.0020 0.0020 <br /> Test Result: Pass ❑Fail 00 Pass ❑Fail ❑ Pass ❑Fail ❑ Pass ❑Fail <br /> Was sensor removed for testing? 24 Yes ❑No ❑NA N Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No Q NA <br /> Was sensor properly replaced and A Yes ❑No ❑NA W Yes ❑No ❑NA ❑Yes ❑No ❑NA ' ❑Yes ❑No ❑NA <br /> verified functional after testing? <br /> Comments—(include information on repairs madeprior to testing, and recommended follow-up for•failed tests) <br /> r If the entire depth of the sump is not tested,specify how much was tested. If the answer tlott WULLwithan <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br /> MAR 2 3 2015 <br />