My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3304
>
2300 - Underground Storage Tank Program
>
PR0516354
>
COMPLIANCE INFO_2008-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2021 2:01:45 PM
Creation date
6/3/2020 10:00:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008-2018
RECORD_ID
PR0516354
PE
2361
FACILITY_ID
FA0012437
FACILITY_NAME
CHEVRON 352324
STREET_NUMBER
3304
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95219
APN
07120013
CURRENT_STATUS
01
SITE_LOCATION
3304 W HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0516354_3304 W HAMMER_2008-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
455
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARB Approved IOM - Executive Orders VR -201-F and VR -202-F (CAS - 9961) <br />INSTALLATION INSTRUCTIONSo <br />HEALY SYSTEMS, INC. <br />CLEANAIR SEPARATOR <br />Page 21 <br />The Model 9961 or 9961 H, Healy Systems Clean Air Separator (CAS) consists of a 400 gallon steel vapor <br />processor vessel that contains a fuel resistant bladder to hold excess gasoline vapors that may develop in <br />gasoline storage tanks during idle periods of gasoline dispensing facility operation. Models and Drawings <br />with a "H" suffix apply to horizontal CAS installations and those without a "H" suffix apply to vertical CAS <br />installations. The CAS assembly weighs approximately 800 pounds which makes it necessary to have a <br />power assisted lifting device available at the installation site to remove the CAS from the transportation <br />vehicle and place it on the required concrete pad (see drawing 9900-9945 or 9900-9945H). The pad <br />(level within 1/8"/foot) is located within 100 feet to the gasoline storage tank vent lines. The pad is a <br />requirement of this installation. DO NOT PLACE THE CLEAN AIR SEPARATOR DIRECTLY ON THE <br />GROUND OR ASPHALT SURFACE. NOTICE: The installer is responsible to ensure that the installation <br />meets the latest edition requirements of NFPA 30A, Chapter 10. No electrical connections are required. <br />The CAS securement method shown in drawing 9900-9945 or 9900-9945H shall be approved by the <br />local authority having jurisdiction with respect to wind and seismic loading. Installer shall not loosen, <br />rotate or remove factory installed fittings or flange as this may damage factory seals and void warranty. <br />In addition to the vapor processor vessel, there is a hardware kit that contains the following: <br />4 Locking 1" NPT Ball Valves <br />4 Pad locks (keyed alike) <br />Breather Assembly, Healy Model 9948 <br />Float Check Valve Assembly, Model 9466G <br />Reference the appropriate Healy Systems installation drawing (9900-9942, 9900-9942H, 9900-9971, <br />9900-9971 H, 9900-9972, 9900-9972H, 9900-9973 or 9900-9973H of this manual) for placement of the <br />above parts for the vent stack configuration required by the local Authority Having Jurisdiction (AHJ) <br />for the Underground Storage Tank (UST) system. A flexible connection between the Clean Air <br />Separator and the vent line(s) is allowable if required by the local Authority Having Jurisdiction <br />(AHJ) to meet seismic requirements. Should the flex connection be installed such that it is not <br />supported, the slope of the flex connection shall be greater than the 1/8"/foot slope required for <br />the rest of the one inch galvanized piping. The local contractor is responsible to provide all necessary, <br />galvanized piping, non -hardening, UL classified pipe joint compound and plumbing fittings. Additional <br />Pressure/Vacuum (P/V) vent valves to complete installation are not included in the hardware kit. Healy <br />is not responsible for the warranty of any other P/V vent valve purchased to complete installation. <br />The CAS arrives at the site assembled and tested. All plumbing shall be done using 1" galvanized <br />steel pipe (Schedule 40) and approved nipples, as called out in the installation drawing appropriate for <br />the site installation. Mounting hardware shall be galvanized or stainless steel. Careful attention must <br />be paid to the installation drawing appropriate for the site installation to assure proper operation of the <br />bladder system. Do not inflate the bladder assembly after installation. <br />It is important that the CAS be secured to the concrete pad as shown in drawing 9900-9945 or <br />9900-9945H of this manual to prevent any unintentional repositioning of the CAS as the connecting <br />plumbing to the vent system is accomplished. <br />Franklin Fueling Systems <br />3760 Marsh Road <br />Madison, Wisconsin 53718 USA <br />ARB Approved Installation, Operation and Maintenance Manual <br />� Y <br />'v Franklin Fueling Systems <br />Website: http __ nkln fu_e_,linc�r,,on� <br />Email ,iinklinfuelmy coin <br />Telephone: 800-225-9787 <br />Fax: 608-838-6433 <br />
The URL can be used to link to this page
Your browser does not support the video tag.