My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
2829
>
2300 - Underground Storage Tank Program
>
PR0536714
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2020 7:10:12 PM
Creation date
6/3/2020 10:00:38 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0536714
PE
2361
FACILITY_ID
FA0011261
FACILITY_NAME
LESCO INC
STREET_NUMBER
2829
Direction
W
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14502013
CURRENT_STATUS
02
SITE_LOCATION
2829 W WASHINGTON ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0536714_2829 W WASHINGTON_.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
270
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
North America Job Hazard Analysis <br /> ERM <br /> ERM Engaging and Managing Subcontractors <br /> Project Name: John Deere Landscapes(Former LESCO Facility) <br /> Project Number: 0129740 <br /> Job/Task Name: Engaging and Managing Subcontractors <br /> JHA No.: 7 <br /> Document Routing <br /> FSO Retain copy in site health&safety file,amend to HASP as necessary. <br /> Project Manager Retain copy in the office health&safety file,amend to HASP as necessary. <br /> Instructions: This JHA has been developed and approved by the North America Safety Team. Prior to conducting fieldwork. <br /> site-specific hazards related to this task must be incorporated by the project team. Once completed,the JHA <br /> should be reviewed regularly with site personnel who will be performing this task. <br /> Task Description: <br /> Guidelines for managing safety of ERM-hired subcontractors to ensure they work safely and ERM liability is minimized. <br /> Hazard Analysis: <br /> Task Step Hazard Control Measures <br /> Choose Subcontractor to Lack of executed contractual documentation may The project PIC and/or PM must ensure a signed,executed <br /> Perform Work increase ERM liability. contract is in-place prior to subcontractors performing work <br /> on the jobsite for ERM. <br /> Insurance documents collected during the safety The project PIC and/or PM must ensure that insurance <br /> prequalification process may not be sufficient to certificates on-file for subcontractors meet or exceed <br /> meet specific client contractual requirements. contractual insurance requirements mandated by ERM clients. <br /> If the insurance certificate on-file is out-of-date or does not <br /> represent sufficient coverage,the project PIC and/or PM must • <br /> obtain an updated insurance certificate from the subcontractor <br /> prior to the subcontractor performing work on the jobsite for <br /> ERM. <br /> Selecting subcontractors that do not meet ERM Consult the North America"Subcontractor Information'page <br /> minimum safety criteria can result in poor safety and select a subcontractor that meets ERM minimum safety <br /> performance on ERM projects. criteria. If selection of an already-prequalified subcontractor <br /> is not possible due to business considerations or client wishes, <br /> rovide enhanced subcontractor oversight on the jobsite. <br /> ERM North America 1 Form Rev.:05-08 <br />
The URL can be used to link to this page
Your browser does not support the video tag.