My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
2829
>
2300 - Underground Storage Tank Program
>
PR0536714
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2020 7:10:12 PM
Creation date
6/3/2020 10:00:38 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0536714
PE
2361
FACILITY_ID
FA0011261
FACILITY_NAME
LESCO INC
STREET_NUMBER
2829
Direction
W
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14502013
CURRENT_STATUS
02
SITE_LOCATION
2829 W WASHINGTON ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0536714_2829 W WASHINGTON_.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
270
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<< North America Job Hazard Analysis <br /> ERM Engaging and Managing Subcontractors <br /> Project Name: John Deere Landscapes(Former LESCO Facility) <br /> Project Number: 0129740 <br /> Job/Task Name: Engaging and Managing Subcontractors <br /> JHA No.: 7 <br /> Task Step Hazard Control Measures <br /> Prepare Site HASP Documents Not informing ERM-hired subcontractors of ERM The project PIC and/or PM must ensure the subcontractor has <br /> safety requirements for their work may expose received a copy of the ERM HASP and supporting <br /> employees to hazardous conditions and cause documentation prior to mobilization to the jobsite. The <br /> unnecessary project delays. subcontractor must be made aware that their personnel must <br /> follow provisions in the ERM HASP at a minimum,but that <br /> they may not rely on ERM documents for their employee's <br /> health and safety protection. <br /> Not obtaining authorized subcontractor signatures Prior to any jobsite work proceeding,obtain the signature of <br /> on ERM HASPS may expose ERM to additional an authorized representative for the subcontractor on the <br /> liability. ERM HASP. Also,have the subcontractor's authorized <br /> representative designate one of their employees,by name,to <br /> serve as the jobsite contact for ERM safety concerns. List the <br /> jobsite safety contact in the ERM HASP. <br /> The lack of a specific scope of work for an ERM Specify both the ERM and the subcontractor's scope of work <br /> subcontractor opens the possibility of whether ERM in the ERM HASP document. Ensure that any subcontractor <br /> or the subcontractor is responsible for certain personnel on-site has reviewed and signed the site HASP. <br /> aspects of jobsite work. <br /> Any ERM attempt to author safety documents for In all cases,require the ERM subcontractor to either develop <br /> use during completion of tasks on jobsites by their own site-specific HASP,or develop Job Hazard Analyses <br /> subcontractors may not be sufficient to fully control QHA)for the specific tasks they will perform. Attach these <br /> site safety hazards posed by subcontractor work. documents to the ERM HASP as appendices. <br /> ERM North America 2 Form Rev.:05-08 <br />
The URL can be used to link to this page
Your browser does not support the video tag.