My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
2829
>
2300 - Underground Storage Tank Program
>
PR0536714
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2020 7:10:12 PM
Creation date
6/3/2020 10:00:38 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0536714
PE
2361
FACILITY_ID
FA0011261
FACILITY_NAME
LESCO INC
STREET_NUMBER
2829
Direction
W
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14502013
CURRENT_STATUS
02
SITE_LOCATION
2829 W WASHINGTON ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0536714_2829 W WASHINGTON_.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
270
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
North America Job Hazard Analysis <br /> ERM Engaging and Managing Subcontractors <br /> Project Name: John Deere Landscapes(Former LESCO Facility) <br /> Project Number: 0129740 <br /> Job/Task Name: Engaging and Managing Subcontractors <br /> JHA No.: 7 <br /> Task Step Hazard Control Measures <br /> Conduct the Work On jobsites where ERM uses subcontracted services, Ensure subcontractor work is overseen by ERM personnel at <br /> additional liability arising from the OSHA"Multi- all times. Whenever subcontractor personnel are present on a <br /> Employer Worksite Rule"may be present. jobsite performing work,an ERM employee should be present <br /> and engaged in the work being performed. <br /> Always include subcontractor personnel in daily jobsite <br /> tailgate safety meetings and have them indicate their presence <br /> and understanding of the information presented by signing <br /> the ERM form documenting the meeting. <br /> ERM personnel at the jobsite should perform regular safety <br /> inspections of the site,including subcontractor activities. Any <br /> deficiencies noted during inspections should be forwarded to <br /> the subcontractor's jobsite safety contact for resolution and <br /> report-back to ERM. For imminent danger situations(those <br /> that may cause loss of life or limb), the ERM inspector should <br /> stop the subcontractor's work and ensure all on site retreat <br /> until the imminent danger hazard is abated. <br /> Do not supply subcontractor personnel with personal <br /> protective equipment(PPE). If PPE must be provided to <br /> subcontractors,ERM personnel must inspect the PPE and <br /> document the inspection prior to providing it to subcontractor <br /> personnel. <br /> If ERM is performing air monitoring for the subcontractor, <br /> ensure calibration of air monitoring equipment is done before <br /> and after each use. At a minimum,air monitoring equipment <br /> must be calibrated at least once per day. Document <br /> equipment calibration and file with the site HASP. <br /> ERM North America 3 Form Rev.:05-08 <br />
The URL can be used to link to this page
Your browser does not support the video tag.