My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
2829
>
2300 - Underground Storage Tank Program
>
PR0536714
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2020 7:10:12 PM
Creation date
6/3/2020 10:00:38 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0536714
PE
2361
FACILITY_ID
FA0011261
FACILITY_NAME
LESCO INC
STREET_NUMBER
2829
Direction
W
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14502013
CURRENT_STATUS
02
SITE_LOCATION
2829 W WASHINGTON ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0536714_2829 W WASHINGTON_.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
270
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.0 FIELD ACTIVITIES <br /> Proposed soil remediation activities for the site consist of the following: <br /> • Excavation of impacted soil followed by confirmation sampling; <br /> • Profiling of the excavated soil; and <br /> • Transportation and off-site disposal of the impacted soil <br /> 4.1 MAJOR PROJECT TASKS <br /> 4.1.1 Activities Performed by ERM <br /> Major tasks to be performed by ERM personnel include the following: <br /> • OSHA hazardous waste operations; <br /> • Overseeing ERM-hired subcontractors; <br /> • Overseeing or performing SSC; <br /> • Groundwater gauging and sampling; <br /> • Vapor well surveying and sampling; <br /> • SWPPP Best Management Practices (BMPs) maintenance and <br /> monitoring activities; <br /> ® Monitoring product levels and bailing/pumping product from wells; <br /> • Implementing SWPPP plan; and <br /> • Implementing traffic control plan. <br /> Each of the tasks above has a Job Hazard Analysis (JHA) prepared for it. <br /> JHAs are included in Appendix B. Other tasks may be identified in the <br /> future. These tasks will require JHAs and will be incorporated into this <br /> HASP. <br /> 4.1.2 Activities Performed by Subcontractors <br /> MajorMajortasks to be performed b ERM subcontractor personnel include the <br /> p Y <br /> following: <br /> • OSHA hazardous waste operations; <br /> • Performing SSC investigations; <br /> ® Operating heavy equipment; <br /> ERM 4-1 DEERE/129740-9/29/2011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.