Laserfiche WebLink
4.0 FIELD ACTIVITIES <br /> Proposed soil remediation activities for the site consist of the following: <br /> • Excavation of impacted soil followed by confirmation sampling; <br /> • Profiling of the excavated soil; and <br /> • Transportation and off-site disposal of the impacted soil <br /> 4.1 MAJOR PROJECT TASKS <br /> 4.1.1 Activities Performed by ERM <br /> Major tasks to be performed by ERM personnel include the following: <br /> • OSHA hazardous waste operations; <br /> • Overseeing ERM-hired subcontractors; <br /> • Overseeing or performing SSC; <br /> • Groundwater gauging and sampling; <br /> • Vapor well surveying and sampling; <br /> • SWPPP Best Management Practices (BMPs) maintenance and <br /> monitoring activities; <br /> ® Monitoring product levels and bailing/pumping product from wells; <br /> • Implementing SWPPP plan; and <br /> • Implementing traffic control plan. <br /> Each of the tasks above has a Job Hazard Analysis (JHA) prepared for it. <br /> JHAs are included in Appendix B. Other tasks may be identified in the <br /> future. These tasks will require JHAs and will be incorporated into this <br /> HASP. <br /> 4.1.2 Activities Performed by Subcontractors <br /> MajorMajortasks to be performed b ERM subcontractor personnel include the <br /> p Y <br /> following: <br /> • OSHA hazardous waste operations; <br /> • Performing SSC investigations; <br /> ® Operating heavy equipment; <br /> ERM 4-1 DEERE/129740-9/29/2011 <br />