My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
12 (STATE ROUTE 12)
>
8751
>
3500 - Local Oversight Program
>
PR0545718
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 3:48:22 PM
Creation date
6/3/2020 11:19:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545718
PE
3528
FACILITY_ID
FA0005526
FACILITY_NAME
K2 LOGISTICS
STREET_NUMBER
8751
Direction
E
STREET_NAME
STATE ROUTE 12
City
VICTOR
Zip
95253
APN
05139001
CURRENT_STATUS
02
SITE_LOCATION
8751 E HWY 12
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chaney, Walton & McCall (LLC) <br /> SCHEDULE FOR PROPOSED ASSESSMENT ACTIVITIES <br /> Once Dole receives approval from the County on this Work Plan, activities will commence <br /> with the pre-field activities described above. The schedule for implementation of the Site <br /> assessment activities and the preparation of the Addendum Report is as follows: <br /> • The preparation of pre-field plans and permits will require approximately three weeks <br /> to complete, and will be initiated following receipt of Work Plan approval by <br /> PHS/EHD. <br /> • The field investigation and laboratory analytical testing will require approximately <br /> five weeks to complete following receipt of approved soil-boring permits. This <br /> estimate includes the standard turnaround time for laboratory analysis of soil samples. <br /> This schedule will be subject to availability of the drilling subcontractor. <br /> • The preparation of the Former VFO - Site Assessment Addendum Report, as outlined <br /> above will require approximately four weeks to complete following the receipt and <br /> evaluation of final analytical laboratory data and information. <br /> In summary, a total of twelve weeks will be required to implement the Site Assessment <br /> work described above. The Former VFO - Site Assessment Report will be submitted to <br /> the County at the conclusion of the assessment. The County will be notified after the <br /> Work Plan is approved if significant changes to the schedule will be necessary. <br /> I <br /> DF100I01.sJCPH.wkp.011900 7 530.758.812$v/f <br /> rccgoupgearthl ink,net <br />
The URL can be used to link to this page
Your browser does not support the video tag.