Laserfiche WebLink
pits was accomplished utilizing augering and sampling devices with <br /> attachable extensions. The field work for this project was <br /> performed under level D personnel protection. <br /> Table <br /> Sample Summary <br /> IL <br /> 1A Sample Name Location Chemical Analysis <br /> S1 pit B stockpile, EPA Method 8020 (BTXE) , <br /> new excavation EPA Method 8015 (TPH-G) , <br /> Total Lead <br /> S2 pit B stockpile, Total Lead <br /> old excavation <br /> S3 new excavation EPA Method 8020 (BTXE) , <br /> pit B, west wall EPA Method 8015 (TPH-G) , <br /> Total Lead <br /> S4 new excavation EPA Method 8020 (BTXE) , <br /> pit B, bottom EPA Method 8015 (TPH-G) , <br /> F Total head <br /> S5 new excavation EPA Method 8020 (BTXE) , <br /> pit B, east wall EPA Method 8015 (TPH-G) , <br /> Total Lead <br /> S5 new excavation EPA Method 8020 (BTXE) , <br /> pit B, north wa'1l EPA Method 8015 (TPH-G) , <br /> Total Lead <br /> �s S7 pit A, bottom EPA Method 8020 (BTXE) , <br /> EPA Method 8015 (TPH-G) , <br /> Total head <br /> S8 pit A stockpile EPA Method 8020 (BTXE) , <br /> EPA M,;�thod 8015 (TPH-G} , <br /> Total Lead <br /> S9 water sample EPA Method 8020 (BTXE) , <br /> £ irrigation well EPA Method 8015 (TPH-G) , <br /> Total Lead, EDB <br />