Laserfiche WebLink
7 <br /> M and M Automotive November 1994 <br /> Site Specific Safety Plan Soil Boring/Sampling <br /> WES Project No. 4070-T Well Installation <br /> k <br /> Directions to Hospital: p <br /> Go West on 10 th Street to Tracy Boulevard. Turn North (right) on Tracy <br /> Boulevard and continue approximately 1/2 mile, Tracy Community Memorial <br /> Hospital is on the East (right) side of the street. <br /> Additional Continency Telephone Numbers: <br /> M and M Automotive 835-7071 <br /> Mr. Larry Mc Lean <br /> Tracy Fire Department 835-4553 <br /> Wright Environmental Services, Inc., 833-0758 <br /> Program Manager, Corporate Safety Officer <br /> John Lynch (Mobile) 481 -1 040 <br /> Project Manager/Site Safety Office <br /> Lester Messina (pgr)547-4699 <br /> SECTION 12 <br /> SAFETY/ORIENTATION TRAINING <br /> 12. 1 FORMAL TRAINING <br /> All WES site personnel shall have completed training relative to the project and <br /> the materials to be encountered during the project. This training shall be <br /> conducted by the WES Safety Officer, and shall include classroom and practical <br /> application exercises regarding the hazards to be expected .and the protective <br /> equipment to be utilized. All employees at the site will be required to have passed <br /> the 40 hour SARA/OSHA training programs for work at Hazardous Materials <br /> Sites. <br /> This formal training is supplemented by daily safety briefings and site-specific <br /> training as required. All subcontractor personnel will be required to complete <br /> the same basic training, and to attend all safety briefings. <br /> SECTION 13 <br /> MEDICAL SURVEILLANCE <br /> WES personnel and subcontractors engaged in project operations shall be <br /> participants in the Medical Surveillance program, and must be cleared by the <br /> examining physician(s) to wear respiratory protection devices and protective <br /> clothing for working with hazardous materials. <br />