Laserfiche WebLink
1 <br /> TABLE OF CONTENTS <br /> 1 .0 INTRODUCTION 1 <br /> 2.0 BACKGROUND 1 <br /> 3.0 SCOPE OF WORK 1 <br /> 31 Site-Specific Health and Safety Plan/Workplan/Permitting I <br /> 3 2 Drilling/Soil Sampling/Grab Groundwater Sampling 2 <br /> 33 Monitoring Well Installation 2 <br /> 34 Monttonng Well Development 2 <br /> 3 5 Groundwater Sampling 3 <br /> 36 Surveying 3 <br /> 4 0 SITE CONDITIONS 3 <br /> 41 Hydrogeology and Subsurface Conditions 3 <br /> 42 Soil Analytical Results 3 <br /> 43 Groundwater Analytical Results 4 <br /> 5.0 DISCUSSION 4 <br /> 6.0 CONCLUSIONS AND RECOMMENDATIONS 4 <br /> 7.0 LIMITATIONS 4 <br /> 8.0 REFERENCES 5 <br /> FIGURES <br /> FIGURE 1 SITE LOCATION MAP <br /> FIGURE 2 SITE PLAN <br /> FIGURE 3 GEOLOGIC CROSS SECTION A-A' <br /> FIGURE 4 ESTIMATED PLUME of CONTAMINATION <br /> TABLES <br /> TABLE 1 SOIL ANALYTICAL RESULTS <br /> TABLE 2 GROUNDWATER ANALYTICAL RESULTS <br /> APPENDICES <br /> APPENDIX A BORING/WELL PERMIT <br /> APPENDIX B WRIGHT SAMPLING PROTOCOLS <br /> APPENDIX C BORING LOGS WITH WELL CONSTRUCTION DETAILS, <br /> WELL DEVELOPMENT AND SURVEY DATA <br /> APPENDIX D LABORATORY REPORTS AND CHAIN-OF-CUSTODY <br /> DOCUMENTS AND WELL MONITORING DATA <br />