Laserfiche WebLink
Ms. Diane Hinson <br /> June 8 , 1989 <br /> Page 3 <br /> i <br /> pumping wells will be sampled quarterly as long as groundwater is <br /> available. The sharp decline in groundwater elevation due to the <br /> prolonged drought conditions in the Stockton area has already <br /> caused MW-2 , MW-3 and MW-4 to go dry. <br /> GTI also proposes to reduce the sampling of domestic wells to <br /> the following schedule: <br /> WELL I.D. SAMPLING FREQUENCY <br /> i <br /> TMG Monthly <br /> 1912 Monthly <br /> 1927 Monthly <br /> 8968 Monthly <br /> 9160 Monthly <br /> 9140 Quarterly <br /> 9156 Quarterly <br /> 9159 Quarterly <br /> 9167 Quarterly <br /> Your consideration of this proposal is appreciated. If you <br /> should require additional information, please do not hesitate to <br /> contact our Concord office at (415) 671-2387. <br /> Sincerely, <br /> GROUNDWATER TECHNOLOGY, INC. <br /> Q -6? <br /> Joseph R. Ramage <br /> Project Geologist <br /> JRR:kmh <br /> L2894G3 .JR <br /> cc: Mr. Hal Miller <br /> Southland Corporation <br /> BFU <br /> TECHNOLOGY,INC, <br />