My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
9110
>
3500 - Local Oversight Program
>
PR0545727
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2020 4:18:40 PM
Creation date
6/3/2020 4:00:01 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0545727
PE
3528
FACILITY_ID
FA0005693
FACILITY_NAME
7-ELEVEN INC. STORE #20680
STREET_NUMBER
9110
STREET_NAME
THORNTON
STREET_TYPE
Rd
City
Stockton
Zip
95209
CURRENT_STATUS
02
SITE_LOCATION
9110 Thornton Rd
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
297
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Diane Hinson <br /> June 8, 1989 <br /> Page 2 <br /> concentrations reported in the other wells are sporadic, probably <br /> the result of sampling or laboratory error. In addition, <br /> 4 domestic well usage has been discontinued for consumption. <br /> Therefore, GTI proposes that the sampling frequency be reduced <br /> for many of these wells. <br /> GTI proposes to reduce the sampling of monitoring and pumping <br /> wells to the following schedule: <br /> WELL I.D. SAMPLING FREQUENCY <br /> PW-1 Twice Monthly <br /> RW-1 Twice Monthly <br /> MW-1 Monthly <br /> PW-3 Monthly <br /> MW-2 Quarterly When Possible 1 <br /> f MW-3 Quarterly When Possible <br /> MW-4 Quarterly When Possible <br /> MW--5 Quarterly <br /> MW-7 Quarterly <br /> MW-8 Quarterly <br /> MW_9 Quarterly <br /> MW-10 Quarterly <br />!4 MW-11 Quarterly <br /> MW-13 Quarterly <br /> MW-14 Quarterly <br /> PW-2 Quarterly <br /> To remain in compliance with the current waste-water discharge <br /> permit, air-stripper influent from PW-1 and RW-1 and air-stripper <br /> effluent will continue to be sampled twice monthly. Monitoring <br /> wells MW-1 and PW-3 will be sampled monthly to monitor variations <br /> in the dissolved-hydrocarbon plume. All remaining monitoring and <br /> GROUNDWATER <br /> TECHNOLOGY,INC. <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.