My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
9110
>
3500 - Local Oversight Program
>
PR0545727
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2020 4:09:01 PM
Creation date
6/3/2020 4:05:38 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545727
PE
3528
FACILITY_ID
FA0005693
FACILITY_NAME
7-ELEVEN INC. STORE #20680
STREET_NUMBER
9110
STREET_NAME
THORNTON
STREET_TYPE
Rd
City
Stockton
Zip
95209
CURRENT_STATUS
02
SITE_LOCATION
9110 Thornton Rd
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> TASK 4 - P rmittin f Va r <br /> Extra tion # m <br /> 4.1 Prepare and <br /> agencies, submit permit applications for appropriate regulatory ry <br /> Provide regulatory <br /> for ry support and meet with re <br /> frequency based nodesign of he s steland and negotiate for regulatory agency <br /> Y m. <br /> minimum monitoring <br /> SKS - 1 ' <br /> MY Va or Extra tin st m <br /> 5.1 <br /> Install the VES using 220 volt single phase <br /> 5.2 instal! the Power. <br /> 24,000 activated carbon adsorption reactors and purchase <br /> Pounds of activated carbon. <br /> 5.3 Manifold the VES exhaust to the activated d carbon reactors. <br /> Install sampling ports, valves, gauges, and monitoring 5.5 Install fire onng data sheets. <br /> information board extinguisher(s), health <br /> and Health and Safe accordance with local and safety signs, and <br /> Safety Codes. Department Codes <br /> TASK 6 - Initial TW -Week <br /> tart-U f Va r Extra ti n S <br /> 6.1 Notify appropriate regulatorytem <br /> 6.2 agencies of start-up date. <br /> Of the vapor extraction <br /> determine system pertormance and system <br /> rov Provide doth SKC carbon tubes t <br /> 6.3 cumentation for closure. o <br /> Monitor the efficiency <br /> satisfy air permit requirments�e activated carbon adsorption system <br /> 6.4 Adjust flow Y to <br /> Adjustratios from the vapor <br /> efficiency of the vapor extraction system. extraction wells to <br /> TASK 7 . maximize <br /> M nitorin Maint n n <br /> and eration f th <br /> 1 Monitor the VES for One Year <br /> the V concentration of the <br /> configuration and flows to extracted well vapors, <br /> vapors and minimize duration maximize recovery and adjust <br /> basis for the first month of o °f operation of the s stm f contaminant <br /> Aeration and bimonthly ther after. on a weekly <br /> �•2 Pertorm preventative <br /> check to insures maintenance on the vapor <br /> ystem is operating at maximum fficiency <br /> 7 3 ion system and <br /> Changeout and replace activated carbon as required. <br /> VAPOR EXTRACTION TECHNOLOGY <br />
The URL can be used to link to this page
Your browser does not support the video tag.