Laserfiche WebLink
COMMENTS ON DEVELOPMENTS <br /> GP-92-16/ZR-92-18/SU-92-16/TA-92-17/UP-92-30 PRE-APPLICATIONS <br /> 3 . Hydrologic and hydraulic analyses shall be conducted to <br /> determine the impacts of discharging into Bear Creek. <br /> All property, both downstream and upstream of this discharge <br /> shall not be subject to a higher flood level as a result of the <br /> proposed drainage. (Development Title Section 9-1605. 5) <br /> For TA-92-17: <br /> ----NONE---- <br /> For SU-92-16: <br /> 1. All improvements shall be in conformance with the Improvement <br /> Standards and Specifications of the County of San Joaquin. <br /> All improvement plans and specification must be approved by <br /> the County of San Joaquin Department of Public Works prior to <br /> approval of the Final Map. (Development Title Section 9-910.2) <br /> 2 . If improvements referred to herein are not completed prior to <br /> the approval of the Final Map, the subdivider shall execute <br /> an agreement with the County of San Joaquin insuring the <br /> completion of improvements within one (1) year after filing <br /> the Final Map. (Development Title Section 9-1100. 3) <br /> 3 . Via Valenti Court shall be dedicated and improved to County <br /> Standards for a 50-foot right-of-way rural residential road. <br /> (Development Title Section 9-857.4) <br /> 4 . Terminal drainage by an underground collection system shall be <br /> provided to meet the requirements of the County and to provide <br /> adequate drainage for the subdivision. A community detention <br /> pond may be required pending the Hydrologic and Hydraulic study <br /> report. (Development Title Section 9-1135. 2) <br /> 5. Street lighting shall be provided at the end of Via Valenti <br /> Court and the intersection with North 99 Frontage Road (east) . <br /> (Development Title Section 9-1150. 11) <br /> 6. A County Service Area shall be formed prior to the approval <br /> of the Final Map to provide for the operation, maintenance, <br /> and improvement of storm drainage and street lighting <br /> facilities. (Development Title Section 9-1100.5) <br /> 2 <br />