Laserfiche WebLink
COMMENTS ON DEVELOPMENTS <br /> GP-92-16/ZR-92-18/SU-92-16/TA-92-17/UP-92-30 PRE-APPLICATIONS <br /> 14 . All traffic signs and markings shall conform to the Manual <br /> on Uniform Traffic Control Devices and San Joaquin County <br /> Standards, and shall be shown on the improvement plans. <br /> (Development Title Section 9-1150.2) <br /> 15. Access rights shall be dedicated and restricted for lot <br /> 6 along the frontage of North 99 Frontage Road (East) . <br /> (Development Title Section 9-1150. 5) <br /> 16. Any development shall respect the possible future widening of <br /> State Highway 99 and Frontage Road and shall be noticed by a <br /> statement on the Final Map. . <br /> (Development Title Section 9-1150. 2) <br /> (Subdivision Map Act Section 66411. 1) <br /> For UP-92-30: <br /> 1. Any development shall respect the possible future widening of <br /> State Highway 99 and Frontage Road. <br /> (Development Title Section 9-1150. 2) <br /> 2 . Encroachment permit shall be required for work within road <br /> right-of-way. <br /> (Development Title Section 9-1145.2) <br /> 3 . The Traffic Impact Mitigation Fee will be required for this <br /> development. The fee is due and payable at the time of <br /> building permit application. (The fee currently is $2, 079. 00 <br /> per 1, 000 gross square foot of building as "Service Commercial" <br /> in the Lodi area. The fee shall be automatically adjusted July <br /> 1 of each year by the Engineering Construction Cost Index as <br /> published by the Engineering News Record. ) <br /> (Resolution R-90-304, R-91-1025) <br /> 4. The Water Supply Facilities Impact Mitigation Fee will be <br /> required for this development. The fee is due and payable at <br /> the time of building permit application. (The fee currently <br /> is $236. 00 per 1, 000 gross square foot of building as <br /> "Service Commercial" . The fee shall be automatically increased <br /> on January 1 of each year at the rate of 6.9 percent. An <br /> additional 3 . 5 percent shall be added to the fee upon payment <br /> for processing and administering the program. <br /> (Resolution R-91-327) <br /> 5. A National Pollution Discharge Elimination System permit may <br /> be required. (Development Title Section 9-1135.2) <br /> 4 <br />