Laserfiche WebLink
2 <br /> 2. WORK PLAN <br /> Work to be conducted on-site includes: <br /> Prepare a Work Plan to perform monitoring well `destructions, preparing a Site <br /> Safety Plan, and submitting permits <br /> Manage the project and performing regulatory liaison <br /> Direct destruction of five monitoring wells by pressureroutin . <br /> 9 9 <br /> Prepare a report describing the results of the monitoring well destruction at the <br /> subject site <br /> • <br /> M~%"-26IVncr0Wr.rptJCXA2ZOM SMTH <br />