My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3425
>
3500 - Local Oversight Program
>
PR0545737
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2020 2:32:19 PM
Creation date
6/5/2020 2:23:04 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545737
PE
3528
FACILITY_ID
FA0003627
FACILITY_NAME
ARCO 02093
STREET_NUMBER
3425
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
21418020
CURRENT_STATUS
02
SITE_LOCATION
3425 TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
tK. <br /> s I�I <br /> S ATE OF CALIFORNIA E KMEJIAN,Governor <br /> CALIFORNIA REGIONAL WATER bUALITY CONTROL BOARD— MAR 2 1969 ' <br /> CENTRAL VALLEY REGION ., <br /> 3443 ROUTIER ROAD <br /> SACRAMENTO,CA 95827-3098 ENV;RONM€NTAL HEALTH <br /> PERMIT/SERVICES <br /> Mr. Kyle Christie 28 February 1989 <br /> ARCO Products Company <br /> P.O. Box 5811 <br /> San Mateo, CA 94403 <br /> WORK PLAN FOR PROBLEM ASSESSMENT INVESTIGATION FOR ARCO STATION NO. 2093 AT <br /> 3425 TRACY BOULEVARD, TRACY, SAN JOAQUIN COUNTY <br /> Thank you for submitting your 10 October 1988 work plan for this site for our <br /> review. This letter is a response to both the 10 October 1988 work plan and <br /> the incomplete 27 September 1987 PAR. <br /> WORK PLAN (10 October 1988) <br /> The work proposed in this work plan will not define the full extent of <br /> petroleum hydrocarbon contamination related to this site. A' site assessment, <br /> and corresponding PAR, 'cannot be considered complete until the "effective zero <br /> line" has been established. I discussed this by telephone with your <br /> consultant, Mr. Lawrence Phillips of Brown and Caldwell (BC)' on 21 February <br /> 1989. Mr. Phillips stated that BC, in agreement with ARCO, plans a phased <br /> approach site investigation which consists of the on-.site phase followed by <br /> the off-site phase. The current work plan is for the on-site phase of. the <br /> investigation to supply soil and.ground water data to assist in selecting the <br /> locations of the monitoring wells for the off-site phase of the investigation. <br /> Although we believe this investigation has been protracted inordinately, we <br /> agree to accept this phased approach investigation with the understanding that <br /> the results of the on-site phase, along with. a work plan for the off-site <br /> phase are to be submitted to us and the San Joaquin Local Health District <br /> (SJLHD) by 15 April 1989. We request that water samples ;be °'collected from all <br /> the monitoring wells, and in addition to BTX&E and TPH .an:alyses, 1,2-dichloro- <br /> ethane analyses be performed. <br /> In the off-site investigation the full extent of ground water contaminated by <br /> petroleum hydrocarbons is to be defined and integrated with the on-site work. <br /> k : The¢documentai i on `i s td `be subini tted as a er vi sed"PAK_tc�__ an&'-tH&' -" <br /> 2 June 1989. The revised PAR is to expand on the information prese!�ted in the <br /> 28 September 1987 PAR and include all other necessary information as specified <br /> in my summary below and Appendix A of the Tri-Regional . gidelines, pages A-9 <br /> through A-11 (enclosed) . <br /> PROBLEM ASSESSMENT REPORT (28 September 1987) <br /> The 28 September 1987 PAR cannot be considered complete because the extent of <br /> the hydrocarbon plume was not defined. In addition, we have the following <br /> comments about the submitted PAR that are -to be addressed in your revised PAR: <br /> 1. All ground water wells within 2001) feet of this site are to be <br /> identified and shown on a well survey map. One municipal well was <br /> identified in the 28 September 1987 PAR, but no mention was made -about <br /> private domestic or irrigation hells. If no. private -domestic or <br /> irrigation wells are ,within 2000 feet of the site, so state; <br />
The URL can be used to link to this page
Your browser does not support the video tag.