Laserfiche WebLink
ARCO 1 BP WELL MONITORING DATA SHEET <br /> •� BTS # Station # �V <br /> Sampler, Date <br /> Well I DWell Diameter. 2 3 4 6 8 <br /> Total Well Depth Z D Depth to Water <br /> Depth to Free Product Tluckness of Free Product (feet). <br /> Referenced to <!E2Grade DO Meter (1f req'd) YSI HACH <br /> Well Dlaiuctai MulhpLLU Well Djametci Mullinher- <br /> I" 004 4' 065 <br /> 2' 0 16 6" 147 <br /> 3" 0 37 other radpu2•0 163 <br /> Purge Method Bailer Sampling Method Bailer <br /> Disposable Bailer XDtsposable Bailer <br /> A.4iddleburg Extraction Port - r <br /> Electric Submersible Other <br /> Extraction Pump <br /> Other � <br /> Top of Screen If well is listed as a no-purge, confirm that water level is below the top <br /> • of screen Otherwise,the well must be purged <br /> X 3 = __ 1 Z AI - Gals <br /> I Case Volume(Gals) Specified Volumes Calculated Volume <br /> Conductivity <br /> Time Temp (°F) PH (MS o µS Gals Removed Observations <br /> I 2- S I <br /> J. efz <br /> Did well dewater? Yes 0 Gallons actually evacuated- IZ <br /> Sampling Time- 1 Sampling Date. o <br /> Sample 1.1) -- Laboratory face e�o_a Other <br /> r <br /> Analyzed for PII-G BTEx MTBE TPH-D ocher ,,/, Dx 44-s <br /> mss <br /> DO (if req'd) Pre-purge Mg/L Post-purge �, L <br /> O R.P (if req'd)- Pre-purge mV Post-purge n1V <br /> Blaine Tech Services, Inc. 1680 Rogers Ave., San Jose, CA 95112 (408) 573-0555 <br />