My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3725
>
2300 - Underground Storage Tank Program
>
PR0231417
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/31/2020 10:27:57 AM
Creation date
6/8/2020 10:00:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0231417
PE
2361
FACILITY_ID
FA0003780
FACILITY_NAME
TRACY SHELL*
STREET_NUMBER
3725
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
21217030
CURRENT_STATUS
01
SITE_LOCATION
3725 N TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Figure 2 drain valve passes testing no further maintenances <br /> required. If the drain valve fails testing, remove the <br /> Step 8: (See Figure 3&4) valve, soak in water and use high-pressure air, if <br /> Install adjusting system beneath tabs on mounting needed, to clean. Reinstall the drain valve to its <br /> ring. See Figure 3 for standard cover models. See proper position and test the valve with CARB <br /> Figure 4 for sealable cover models. Add shims as procedure TP-201.1 C or TP-201.1 D. If problems <br /> needed and adjust with screw. (Shims must be cut persist, replace the drain valve with P/N 1 DK-2100- <br /> to size for sealable cover models.) The height can EVR (specified torque 11.5 ft-lbs min to 13.5 ft-lbs <br /> be increased up to 1"(2.5cm). max, 5/16-18 UN thread). The sealable cover(1SC) <br /> Note: The adjustment should not be more than 1" adjustment nut is set at the factory, but due to <br /> from the initial length of the unit. environmental conditions it may be necessary to <br /> adjust it to either improve sealing or ease cover <br /> Step 9: removal. <br /> Upon preliminary installation perform the California <br /> Test Procedures TP-201.1C or equivalent. Their terator. <br /> portant: Leave these instructions with Station <br /> Test Procedures will check the seals between the <br /> drain valve, nipple and rotatable adapter. To test <br /> the spill containers base and bellows fill the <br /> container with water. A drop in the water level of <br /> 1/16" or greater after one hour means that a leak <br /> exists. To determine where the leak is, look for a <br /> steady stream of bubbles coming from one of the <br /> joints or water leaking on the outside of the bucket. <br /> NOTE: Do not drain the water into the UST after the ° =7._.C_. ° <br /> test is complete. Water must be disposed of per Height _--__-__- Shims <br /> Adjustment Bolt <br /> local requirements for hazardous waste. If the leak <br /> cannot be corrected the spill container should be ------------ <br /> replaced with another. Adapter --...... Cap <br /> Step 10: (See Figure 2) Figure 3-Standard Cover Model Height Adjustment <br /> Before pouring concrete, place plastic over the cover <br /> and mounting ring protecting them from concrete <br /> splash. Double check that the unit is level and at <br /> proper grade height. Pour concrete per figure 2. <br /> Ramp or dome the concrete away from the mounting <br /> ring. There should be a minimum of 1" slope to <br /> finish grade. The concrete surface should start at <br /> the bottom edge of the watershed slots and tapered <br /> down to grade level. <br /> NOTE:Do not stand on spill container before <br /> concrete sets up. <br /> Remove plastic from cover after concrete has dried. Shims Must <br /> TM <br /> Remove adjustment system. Adaptor and tight fill Be Cut To HeightLength Adjustment <br /> cap can now be installed in sealable cover models. Boit <br /> Re-test the spill containers for leaks as described in <br /> step 9, after the concrete has set up. Use oPw <br /> 116-7085 or <br /> 4"Pipe Cap <br /> Operation and Maintenance: to Support Nipple <br /> Annually: Inspect and clean the interior of the spill Adjustment <br /> container and drain valve screen. Remove System <br /> accumulated dirt and grit. Test the drain valve using Figure 4-Sealable Cover Model height adjustment <br /> CARB procedure TP-201.1C or TP-201.1 D. If the <br /> REQ" E C� <br /> c\'� > 0 2020 <br /> ENVIRONMENTAL HEALTH <br /> 4 DEPARTMENT <br />
The URL can be used to link to this page
Your browser does not support the video tag.