R
<br /> I �T.
<br /> requirements in the completed stockpile, less the weight c' id asphalt
<br /> foot. All hut. depressions exceeding the specified tolerance shall be incorporated in the mix.
<br /> corrected by removing dcfcetivc work and replacing it with new material as The quantity of haul and place premixed bituminous paving material to he
<br /> specified. mcasurcd for payment shall be the number of tons, square yards, or cubic
<br /> AOQ.03.i3 i'retnixcd Eliluminotts Paving Material. The stockpile or yards, as ind:catcd in the proposal, of the aggregate and asphalt mixture
<br /> mixing tabic Premixed
<br /> be cleared of all brush, rubbish. and deleterious acceptably placed and compacted on the roadbed in the compacted work.
<br /> area i When it is indicated in the proposal that premixed bituminous paving
<br /> matter.. y in
<br /> and/or haul and place premixed bituminous paving material is to be
<br /> The constituentslof the premixed material shall be combined by any of the
<br /> methods permitted in these specifications and 'sn such proportions as to measured for payment on a force account basis,mcasurcmcnt shad be made in
<br /> produce a mixture'conforming to the following composition: 1 accordance with subsection 109.03, "Extra and Force Account Werk.-
<br /> ecrcrn,by w�iEm Except when the unit of measurement in the proposal for premixed bitumi-
<br /> _"43 )r nous paving material is force account,bituminous material shall he mcasurcd
<br /> Total%lineral AFgrcgalrc.. ._._._.. . _ ...._...._...__... _......—.... ....__ ...". 4-7 fpr payment by [hC ton in accordance with Section 401, "Rinimix Bitumi-
<br /> Asphatiic E}in.fcrr_—'- •—•_— --- _—._-_'—'_."__—_.." --- nous Pavements—Gencrai.-
<br /> All measurements will be made in accordance with subsection 109.01,
<br /> The material shall be transported, placed and compacted in a manner that "Measurement of Quantities:' Batch weights will not be permitted as a
<br /> will provide the public with a paved, smooth, and stable riding surface as method of measurement unless the alternate provisions of subsection
<br /> approved by the Engineer. 401.03.01,-(b)Requirements for Batching Plants.-. "1. Plant Scales",arc
<br /> MLTHQD OF MEASUREMENT met,in which case the cumulative weight of all the acceptable batches will be
<br /> used for payment. }
<br /> 404.04.01 Measurement. The quantity of roadmix bituminous surface Tonnage shall conform reasonably close to that shown on the plans.unless r
<br /> ent will be the number of tons or cubic otherwise directed. Due to possible variations in the specific gravity and voi
<br /> aggregate to be mcasurcd for paymds
<br /> yards as indicated in the proposal, conforming to all the requirements in the of the aggregates, the thickness may vary from that shown on the plans.
<br /> e mixture is mixed at a central mixing plant by the
<br /> completed work.Whcn thttnSts Or 1'AYMLt�T'
<br /> plantmix method, the number of tons will be determined by weighing the
<br /> completed mixture of aggregate and bituminous material and deducting from 404.05.0: Faynienl. The accepted quantity of materials mcasurcd as
<br /> this weight the weight of the bituminous material. provided in subsection 404.04.01, ,Measurement," will be paid for at the ;
<br /> Mineral aggregate consisting of material in place on the roadbed will not be
<br /> measured and paid for,except for the removal of rocks and lumps as provided contract unit price bid per ton or cubic yard for roadmix bituminous surfacc
<br /> in subsection 404.02.01, "Aggregates;' of this section. All other work aggregate, per ton for bituminous material(liquid asphalt}, and per mile for
<br /> mixing the roadmix bituminous pavement. �M
<br /> involved in scarifying and preparing the material as herein specified shall be The bove rices shall be full compensation for furnishing all the material,
<br /> considered as included in the contract unit price paid for mixing and roadmix mixing, loading,hauling, placing, compacting,and incidentals necessary for
<br /> surfacing. 6• S. S, P c P g
<br /> Mixing and compacting shall be measured in miles along the ccntcrGnc of doing all the work involved in constructing roadmix bituminous surface. as
<br /> the roadway and no extra allowance will ur made for mixing widened sections shown on the plans or establi shed by the Engineer.
<br /> and shoulder dikes, unless allowance
<br /> ac provided in the special provisions. ` Full compensation for furnishing and applying bituminous material or
<br /> The quantity di es shoulder dikes constructed of aspecialbituminous mixture, the asphaltic emulsion as provided for in subsection 404.03.06. "Preparation of
<br /> plaeinc pf which is to be paid for as a contract item on a linear foot basis,will Existing Surface;' shall be considered as included in the contract price paid
<br /> be determined from m^�surements taken along the top of the completed d'kes for thf principal items involved and nn further compensation wilE be allocvcd
<br /> to the nearest otic (1) foot length. The quantities of bituminous mixture used The accepted quantity of premixed bituminous paving m terial and haul and
<br /> to construct the'dikes shat! be measured as set Earth above.
<br /> The quantities of bituminous mixture.the placing of which is to be paid for place premixed bituminous paving material, measured as provided l e stibscc-
<br /> as acontract item on an arca basis in addition to the contract prices paid for tion 404.04.01, "Measurement;'will be paid for by the unit indicated in the
<br /> the bituminous mixture,will be determined from measurements of dee bittntti• prAll payments will be made in accordance with subsection 103.02, "Scope
<br /> nous mixture compacted in place.
<br /> The quantity',of premixed bituminous paving material to be measured for of Payments'
<br /> payment shall',be the number of tons, square yards, or cubic yards, ac accordance rtial payments wraith subscctionn309�0G�"Partial surface-aggregatemay be made in
<br /> indicated in the proposal, of acceptable aggregate conforming to all the Payment will be made under:
<br /> 2Z0 � 221 )
<br /> I
<br />
|