My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012640
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TURNER
>
1
>
3500 - Local Oversight Program
>
PR0545764
>
ARCHIVED REPORTS_XR0012640
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2020 10:13:42 AM
Creation date
6/9/2020 9:50:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012640
RECORD_ID
PR0545764
PE
3528
FACILITY_ID
FA0005330
FACILITY_NAME
ISC WINES OF CALIFORNIA INC
STREET_NUMBER
1
Direction
W
STREET_NAME
TURNER
STREET_TYPE
RD
City
LODI
Zip
95424
CURRENT_STATUS
02
SITE_LOCATION
1 W TURNER RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
503
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a <br /> i <br /> y <br /> i <br /> Pry hrm Pay Unit - <br /> Roadmix Bilumin—,,aurface Aggregate. } <br /> Liquid Asphalt(grade) _ �^ Tan or Cubic Yard <br /> Ton SECTION 4D$ { <br /> Mixing Raadmix Bituminous Surface(width) Mite <br /> Roadmixing MiXcliancous'Arcas(type)_ —Square.Yard <br /> Roadmix Bituminous Shoulder Dikes.. _Linear Foot TACK COAT <br /> Premixed Bituminous Paving Malcrial _._„„,`- Tun,Square Yard,Cubit <br /> Haul and Place Premixed Bituminous Paving Material—TonYSquareoYard.Cubic DLSCRII r10N <br /> Yard,Force Account 405,01.01: General. This work shall consist of preparing and treating an <br /> existing bituminous or concrete surface-with bituminous material in accord- <br /> ance with these specifications and in reasonably close conformity with the <br /> lines shown on the plans or established by the Engineer. <br /> I <br /> MATERIALS <br /> '• 405.02.01 Bituminous Material. Bituminous material: for the tack coat <br /> shall be"Emulsified Asphalt, Type SS—lh(Diluted);"however,the Contrac- <br /> tor may,at his option,substitute"Emulsified Asphalt,Type SS-1 (Diluted)" <br /> for "Emulsified Asphalt, Type 5s—(h (Diluted):' Regardless of the option a� <br /> chosen,bituminous material for the tack coat shall be measured and paid for <br /> under the bid item and at the contract unit price bid per ton for "Emulsified <br /> Asphalt, Type SS—lh (Diluted)" and no further compensation shall be <br /> allowed therefor. <br /> The bituminous material shalt meet the applicable requirements of Section <br /> 703, "Bituminous Materials."The bituminous material may be conditionally <br /> accepted at the source. <br /> Asphaltic emulsion used as a tack coat between the courses of plantmix <br /> surface or over an existing surface shall 6e-of the type and grade specified and <br /> prepared for application as follows: <br /> The emulsion shall be cut b...k by water, \Vater shall be added in the <br /> quantity of forl_v (40)percent of the emulsion by weight. To accomplish this <br /> mixing, the distributor shall be partly filled with water, and the correct <br /> proportion of emulsified asphalt shall then be added,and the remaining water <br /> to be added shall be sprayed into the tank under pressure and then thoroughly <br /> circulated within the distributor. <br /> CONSTRUCTION <br /> 405.03.01 Equipment, The Contractor shall provide equipment for <br /> 3. heating and applying the bituminous material. This equipment shall meet the <br /> requirements of subsection 404.03.42, "Distributors." <br /> 405.03.02 Weather Limi(a(ions. Application of bituminous material <br /> will not be permitted when the surface to be treated is damp or wet or when <br /> weather conditions arc unsuitable or when the atmospheric temperature or <br /> aggregate temperature is below forty (40) degrees Fahrenheit. <br /> 405.03.03 Preparation of Surface. The existing surface shall be <br /> patched and cleaned and be free of irregularities to provide a reasonably <br /> smooth and uniform surface to receive the treatment. The edges of existing <br /> 12221 <br /> [ 223 1 , <br /> i <br /> i <br /> i <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.