Laserfiche WebLink
# � r <br /> a <br /> Mr. Scott Stoner <br /> February 11, 1988 <br /> Page 2 <br /> PROPOSED SCOPE OF WORK <br /> The proposed scope of work would involve drilling soil <br /> borings, colleci:ing soil samples, and generating soil profiles <br /> for indicatinc, the vertical and horizontal extent of the contami- <br /> nation in the vadose zone. It is GTI's opinion that the <br /> contamination is probably concentrated in a limited area (not <br /> laterally extensive) due to the predominance of sandy soils <br /> present in the soil column. However, GTI feels it is important <br /> to'clearly define the sail as well as the groundwater <br /> contamination. The groundwater would be sampled by deepening 3 <br /> of the soil borings to a depth of 15-feet below first encountered <br /> water (or to 70 Feet, whichever occurs first) . The following <br /> -f specific work steps detail GTI's approach:- <br /> 0 <br /> pproachO Drill grade.8 soil borings to approximately 50-feet below ` <br /> o collect soil samples at 5-foot intervals. Five I <br /> selected samples from each boring, based on field f <br /> inspection will be analyzed for total petroleum <br /> hydrocarbons using U.S. Environmental Protection Agency <br /> (EPA) Method 418.1.; benzene, toluene, ethyl.benzene, and <br /> xylenes (BTEX) and total petroleum hydrocarbons as <br /> gasoline using EPA Modified Method 5030/8015/8020; and <br /> polynuclear aromatics (PNA's) using EPA Method 8100. <br /> o Deepen 3 of the 8 soil borings to approximately 70 feet <br /> or to 15-feet below first encountered water (whichever <br /> occurs first)'-. <br /> --o -----Convert-the-3 deepened borings to monitoring wells by - - - - --- --- <br /> installing 2-inch-diameter, 0.020-inch slot, PVC well . <br /> screen to 1.5-feet above expected high water level and <br /> finish to the surface with blank PVC casing. The <br /> annulus of the well will be packed with No. 2 clean- <br /> washed Monterey sand to 2--feet above the screened <br /> Interval A sanitary seal of bentonite followed by <br /> cement grout to the surface will then be installed. <br /> GROONAWATPU <br />