Laserfiche WebLink
Mr. Scott Stoner <br /> February 11, 1988 <br /> Page 4 <br /> PROPOSED WORM. STEP: COST <br /> Drill 8 soil borings to 50 feet $ 10,000.00 <br /> Deepen 3 soil borings to 70 feet; 5,000.00 <br /> install monitoring wells <br /> Laboratory Analyses: <br /> 40 Soil <br /> EPA 418.1 [ $35 - 4,480.00 <br /> EPA 5030/8015/8020 [ $80 - 3,200.00 <br /> EPA 8100 @ $155 = 6,200.00 <br /> 3 Plater <br /> EPA 418.1 @ $85 - 255.00 <br /> EPA 602 A $95 285.00 <br /> EPA 610 [ $180 540.00 <br /> Develop and sample wells - 1,200.00 <br /> Prepare report with recommendations <br /> ___4..500-00 <br /> as per Central Valley Regulations <br /> TOTAL COST ESTIMATE $35,660.00 <br /> Please note that the cost estimate outlined does not include <br /> disposal of any excavated clean or contaminated soil or water. <br /> Additionally, the cost estimate does not include any permitting <br /> fees. Any time required for presentation of plans or projects <br /> will be billed on a time-and-materials basis estimate, according <br /> to the attached rate schedule. <br /> Billing will occur• monthly, on a time-and-materials basis. <br /> Total invoices for services enumerated above would not exceed <br /> - --- <br /> 535,660..00 <br /> -.-without- <br /> prior-approval- from-The Beverage- Source-Irick_. <br /> The costs• presented herein are based on data currently available <br /> to Groundwater Technology, Inc., and we -reserve the right to <br /> K_ <br /> amend our bid if it- is warranted by the site conditions. <br />