PROJECT SCHEDULE <br /> Following approval of the Workplan, ATC anticipates beginning the fieldwork within two weeks <br /> of approval of this workplan and the well installation permit.: The initial fieldwork is estimated to <br /> be completed in two days. Final reports will be prepared within three weeks of receiving the <br /> certified analytical reports. <br /> If you have any questions regarding this project, please call David Oliver at (530) 878-6001. <br /> Sincerely, <br /> ATC Associates, Inc. <br /> i <br /> David W. Oliver James A. Lehrman, RG, CHG <br /> Project Geologist Program Director,Subsurface Remediation f <br /> Attachments: Figure 1.- Site Location Map <br /> Figure 2- Site Vicinity Map <br /> Figure,3 - Site Detail Map <br /> Soil Boring Permit Application <br /> M1: <br /> Copies: Mr. Duane Wallace, Hanson Engineering;:Inc.. <br /> r <br /> E. <br /> ATC Associates Inc. 6 75.75128.0001 <br /> i <br /> '` r <br />