Laserfiche WebLink
s ti <br /> . Monitoring Well Installation Work Plan <br /> PLAZA LIQUORS II <br /> 2420 West Turner Road, Lodi, California <br /> - TABLE OF CONTENTS <br /> SECTION PAGE <br /> 1.0. INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 <br /> 2.0. SCOPE OF WORK . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 <br /> 21 PERMITTING AND PRE-FIELD WORK ACTIVITIES 1 <br /> 22 MONITORING WELL PILOT BORING ADVANCEMENT AND SAMPLING <br /> 2 <br /> 2 2 1 Soil Collection and Analyses 2 <br /> 23 WELL COMPLETION, DEVELOPMENT AND SURVEY 3 <br /> 24 GROUND WATER SAMPLE COLLECTION AND ANALYSIS 3 <br /> 25 REPORT PREPARATION 4 <br /> 3.0. FIELD PROCEDURES 4 <br /> 3 1 MONITORING WELL PILOT BORINGS AND SOIL SAMPLING 4 <br /> 32 WELL COMPLETION 5 <br /> 33 WELL DEVELOPMENT AND SURVEY 5 <br /> 34 GROUND WATER SAMPLING PROCEDURES 6 <br /> 3 4 1 Static Water Level Measurements 6 <br /> 3 4 2 Well Evacuation 6 <br /> 3 4 3 Sample Withdrawal 6 <br /> 3 4 4 Sample Handling 7 <br /> 35 EQUIPMENT DECONTAMINATION 7 <br /> 36 BORING ABANDONMENT 7 <br /> FIGURES <br /> Figure 1 -Location Map <br /> Figure 2 - Site Plan with Proposed Monitoring Well Locations <br /> Figure 3 -Proposed Ground Water Monitoring Well Design First Ground Water <br /> Figure 4 -Proposed Ground Water Monitoring Well Design Deep-Zone Ground Water <br /> APPENDIX <br /> Appendix A - Site Background Information <br /> Advanced GeoEnvironmental,Inc <br />